Find Project

    Filter by:

    • Search
    • Year
    • Client Name
    Thursday, 31 October 2024 08:25

    Underwater oil hose assembly services

    Smit Lamnaco is carrying out replacement of underwater oil hoses at Baku-Supsa Oil Pipeline. IDC scope is to assemble hoses for New SPM. IDC provides various equipment (cranes, forklifts, motorboats, generators, lighting towers, containers etc.) for the Client. Also, IDC is providing various category personnel, such as Project Coordinator, Project manager, Site Supervisor, Hose assembly Supervisor, Hose Assembly Technician, HSE Officers, Lifting Supervisors, Riggers / Slingers, PACE terminal operations, etc. The works are performed at Poti Port in Georgia.

    Project Details

    • Client Name Smit Lamnaco Georgian Branch
    • Work Type Provision of Services
    • Start February 2024
    • Completion April 2024
    • Location Georgia
    Published in Projects

    Civil works - temporary works, site clearance, site set-up, transportation (including handling and lifting) of materials and equipment, in-situ concrete, pre-cast concrete, piling, excavations, shoring, fencing, man-holes, pits/covered tanks, sewer and water main renovation and ancillary works, pipelines and pipework (on ground, in trenches), roads and pavings, earthworks, ground investigation, building works, reinstatement, river crossings works, drainage works, dewatering, cable ducting (below ground), procurement, supply and delivery of materials and consumables, painting , waterproofing, inspection and testing, removal of excess and waste materials from the worksite upon completion of the work., preparation of as-built and materials traceability drawings, weld record/NDE drawings and the compilation and presentation of certification packages.

    Structural works - structural fabrication, pre-fabrication, transportation (including handling and lifting) of pre-fabricated assemblies, materials and equipment, structural construction, procurement, supply and delivery of consumables, inspection and testing, removal of excess and waste materials from the worksite upon completion of the work, preparation of as-built and materials traceability drawings, weld record/NDE drawings and the compilation and presentation of certification packages.

    The Project is on Call-off basis.

    Project Details

    • Client Name BP Exploration (Caspian Sea) Ltd. - Georgia
    • Work Type Provision of Civil Services for BTC/SCP and WREP in Georgia
    • Start February 2018
    • Completion September 2026
    • Location Georgia
    Published in Projects
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio