    Tuesday, 31 October 2017 13:19

    Provision of Minor Winter Works

    Provide and maintain access roads (total length approximately 25km) to a set number of Block and Check Valves sites on the western section in conjunction with maintaining life services and support to the physical security assets that are deployed to the Block and Check Valves.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Maintenance
    • Start November 2005
    • Completion March 2006
    • Location Georgia
    Published in Projects

    Architectural design of structure surfaces. Design of generators or heavy capacity batteries storage area in structures’ lower bay. Design of bank revetments and river-bed landscape due to environmental fitness. Hydrological recalculation of cross hydraulic structures in case of lack of orifices.
    Topographic and geotechnical survey of 9km long Tori access road, hydrological surveys, design of gravel road structure and artificial structures (design of three small bridges and 32 culverts).

    Project Details

    • Client Name BP/BTC Co
    • Work Type Detail design
    • Start October 2005
    • Completion November 2005
    • Location Georgia
    Published in Projects

    Survey of structures and all associated bearing elements, define of construction requirements for ventilators installation, cables tracking on the wall, design of strengthening r/c slab and butt fitting, design of support frame, structures calculation from seismic impact point

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design, Structural Study
    • Start October 2005
    • Completion November 2005
    • Location Georgia
    Published in Projects

    Geodetic survey and geotechnical visual check was performed on PSG1 and PSG2 area. Design of reinforced concrete foundation for hazardous and non-hazardous landfills. Design of structural part and foundation of wheel barrow parking area structure.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Detail design, Field Survey
    • Start September 2005
    • Completion November 2005
    • Location Georgia
    Published in Projects

    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
    Supervision of construction services such as - graveling two yards with total area of 928km2 and fencing with barbed wire. Constructing two office modules, changing closet for personnel, catering module, toilets, and security booth. Concreting reinforced concrete slabs due to fuel tank and diesel generator placement. Installation of steel containers for material and tools storage. Installation of water pump; tracking power supply, water supply and se3wage systems. Arrangement of 1200m long and 5m wide landfill access gravel road.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start October 2005
    • Completion November 2005
    • Location Georgia
    Published in Projects

    Prepare plans of the existing facility. Determination of floor loading per square meter on the first floor of warehouse
    Calculation the warehouse for 8 point seismic load in case the walls on the ground and first floors are demolished.
    Determination of repair works scopes including concrete, carpentry, plastering, electrical and etc works.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Structural Study, Repair Works Scopes development
    • Start June 2005
    • Completion August 2005
    • Location Georgia
    Published in Projects
    Tuesday, 31 October 2017 13:03

    Minadze Road Rehabilitation

    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
    Supervision of construction services such as - cleaning and partially profiling road with area of 1200km2, arranging soil and reinforced concrete ditches; placing steel culverts at the yard entrances and road crossings; arranging reinforced concrete inlet and storm wells etc.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Project Management
    • Start June 2005
    • Completion July 2005
    • Location Georgia
    Published in Projects

    Performing reconnaissance works of North-South Gas Main passing through Georgia together with GGIC personnel. Due to planning survey and design work development producing survey and design packages, determining calendar schedule and estimate of survey and design works cost. Survey and design works include four main components: gas pipeline, geotechnical hazards, gas pipeline infrastructure, and environmental protection.

    Project Details

    • Client Name BP Exploration (Caspian Sea) Ltd. - Georgia
    • Work Type Feasibility Study
    • Start June 2005
    • Completion September 2005
    • Location Georgia
    Published in Projects

    Drilling geotechnical boreholes, conducting laboratory analysis of soil samples. Possibilities to install and conduct various types of communications like low and high voltage power transmission lines, water supply system were determined. Relevant report development.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start June 2005
    • Completion August 2005
    • Location Georgia
    Published in Projects

    Design and arrangement of temporary dams at 6 small stream crossings in Bakuriani Districts, in order to avoid spread of potentially oil contaminated water. Dams represent sandbags and in order to ensure rigidity of the dam and undertake potential pressurization of water, they are placed in accordance to some specific rule and are fixed in with reinforcement.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start June 2005
    • Completion August 2005
    • Location Georgia
    Published in Projects