Find Project

    Filter by:

    • Search
    • Year
    • Client Name

    Designing of measures for protection of BTC/SCP and WREP Pipelines from washout at the river Shamkirchai, Azerbaijan

    Temporary measures, for protection of Pipelines from washout, have been designed at the river Shamkirchai and permanent measures are in the stage of designing. Designing includes arrangement of concrete and riprap barrages, arrangement of river bed revetment structures by means of riprap.

    Project Details

    • Client Name: BP Exploration (Caspian Sea) Ltd. - Georgia
    • Work Type: Detail design
    • Start: October 2009
    • Completion: March 2010
    • Location: Azerbaijan
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    Search