მოძებნე პროექტი

    ძებნის პარამეტრები

    • საძიებო სიტყვა
    • წელი
    • კლიენტი
    ორშაბათი, 30 ოქტომბერი 2017 19:01

    Survey of Kura River Downstream of Crossing Site at KP 223 for Design of Village Protection Works

    Topographic survey of Kura river downstream of crossing site at KP 223 using Total Station equipment for design of village protection works.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Field Survey, Drawings Development
    • Start თებერვალი 2005
    • Completion თებერვალი 2005
    • Location Georgia
    Published in Projects

    Topographic survey of Kura West River crossing, Obtaining hydrological data for Kura East River crossing.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start თებერვალი 2005
    • Completion თებერვალი 2005
    • Location Georgia
    Published in Projects
    ორშაბათი, 30 ოქტომბერი 2017 18:56

    Geodetic Survey and Installation of Monitoring Wells at Iagluja

    Drilling boreholes and arrangement of piezometers for underground water encountering and water level monitoring purposes. Taking water and soil samples and carry out lab analysis, arrangement of monuments for monitoring the land-slide area.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start იანვარი 2005
    • Completion იანვარი 2005
    • Location Georgia
    Published in Projects
    ორშაბათი, 30 ოქტომბერი 2017 18:55

    Structural and Geotechnical Assessment of Proposed Warehouse Space

    Spatial modelling of building carcass on cross and long seismic forces using program Lira, determination of the strength of earthquake the existing building shall resist, design of constructive measures to increase the building seismicity, calculation of the floor of the building on loads caused by transport movement.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Field Survey, Structural Study
    • Start დეკემბერი 2004
    • Completion მარტი 2005
    • Location Georgia
    Published in Projects
    ორშაბათი, 30 ოქტომბერი 2017 18:53

    Detail Design of Secondary Oil Containment Structures for BTC Pipeline

    Hydrological survey, hydraulic calculation of structures, structures bearing constructions design, access road design, and construction works scopes and schedules determination, construction works cost estimation.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Field Works, Detail design
    • Start დეკემბერი 2004
    • Completion თებერვალი 2005
    • Location Georgia
    Published in Projects
    ორშაბათი, 30 ოქტომბერი 2017 15:59

    Pipeline Construction Support Services

    Trench line safety barrier construction, damage repair to essential services or structures, area clean-up and row clean-up, Akhaltsikhe and Tsalka Camps maintenance works, BV17, BV18, BV21 and BV22 maintenance works

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Maintenance
    • Start ოქტომბერი 2004
    • Completion მარტი 2005
    • Location Georgia
    Published in Projects
    გვერდი 6 სულ 6
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    ძებნა