    Structural Survey/Assurance & Requirements for New BTC Warehouse Area

    Survey of structures and all associated bearing elements, define of construction requirements for ventilators installation, cables tracking on the wall, design of strengthening r/c slab and butt fitting, design of support frame, structures calculation from seismic impact point

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Design, Structural Study
    • Start ოქტომბერი 2005
    • Completion ნოემბერი 2005
    • Location Georgia
    Published in Projects

    Geodetic survey and geotechnical visual check was performed on PSG1 and PSG2 area. Design of reinforced concrete foundation for hazardous and non-hazardous landfills. Design of structural part and foundation of wheel barrow parking area structure.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Detail design, Field Survey
    • Start სექტემბერი 2005
    • Completion ნოემბერი 2005
    • Location Georgia
    Published in Projects
    სამშაბათი, 31 ოქტომბერი 2017 13:10

    Temporary Construction Camp and Gravel Road Construction at Iagluja Landfill Area

    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
    Supervision of construction services such as - graveling two yards with total area of 928km2 and fencing with barbed wire. Constructing two office modules, changing closet for personnel, catering module, toilets, and security booth. Concreting reinforced concrete slabs due to fuel tank and diesel generator placement. Installation of steel containers for material and tools storage. Installation of water pump; tracking power supply, water supply and se3wage systems. Arrangement of 1200m long and 5m wide landfill access gravel road.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start ოქტომბერი 2005
    • Completion ნოემბერი 2005
    • Location Georgia
    Published in Projects
    სამშაბათი, 31 ოქტომბერი 2017 13:05

    Detailed Scope of Work and Cost Estimation for BTC Ops Warehouse Repairing Works

    Prepare plans of the existing facility. Determination of floor loading per square meter on the first floor of warehouse
    Calculation the warehouse for 8 point seismic load in case the walls on the ground and first floors are demolished.
    Determination of repair works scopes including concrete, carpentry, plastering, electrical and etc works.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Structural Study, Repair Works Scopes development
    • Start ივნისი 2005
    • Completion აგვისტო 2005
    • Location Georgia
    Published in Projects
    სამშაბათი, 31 ოქტომბერი 2017 13:03

    Minadze Road Rehabilitation

    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
    Supervision of construction services such as - cleaning and partially profiling road with area of 1200km2, arranging soil and reinforced concrete ditches; placing steel culverts at the yard entrances and road crossings; arranging reinforced concrete inlet and storm wells etc.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Project Management
    • Start ივნისი 2005
    • Completion ივლისი 2005
    • Location Georgia
    Published in Projects
    ორშაბათი, 30 ოქტომბერი 2017 20:01

    The Provision of Technical Expertise to Georgian Gas International Corporation (GGIC)

    Performing reconnaissance works of North-South Gas Main passing through Georgia together with GGIC personnel. Due to planning survey and design work development producing survey and design packages, determining calendar schedule and estimate of survey and design works cost. Survey and design works include four main components: gas pipeline, geotechnical hazards, gas pipeline infrastructure, and environmental protection.

    Additional Info

    • Client Name BP Exploration (Caspian Sea) Ltd. - Georgia
    • Work Type Feasibility Study
    • Start ივნისი 2005
    • Completion სექტემბერი 2005
    • Location Georgia
    Published in Projects
    ორშაბათი, 30 ოქტომბერი 2017 19:59

    Geotechnical Investigation and Services Assessment to Borjomi OSR Base

    Drilling geotechnical boreholes, conducting laboratory analysis of soil samples. Possibilities to install and conduct various types of communications like low and high voltage power transmission lines, water supply system were determined. Relevant report development.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start ივნისი 2005
    • Completion აგვისტო 2005
    • Location Georgia
    Published in Projects
    ორშაბათი, 30 ოქტომბერი 2017 19:54

    Temporary Secondary Containment – Kodiana Sector

    Design and arrangement of temporary dams at 6 small stream crossings in Bakuriani Districts, in order to avoid spread of potentially oil contaminated water. Dams represent sandbags and in order to ensure rigidity of the dam and undertake potential pressurization of water, they are placed in accordance to some specific rule and are fixed in with reinforcement.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start ივნისი 2005
    • Completion აგვისტო 2005
    • Location Georgia
    Published in Projects
    ორშაბათი, 30 ოქტომბერი 2017 19:52

    Provision of GWM Well Installation

    Drilling boreholes of various depths (10-30m) in Tabatskuri and Bakuriani districts. Installation of piezometers to carry out monitoring of underground waters and contamination levels.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Field Survey
    • Start ივნისი 2005
    • Completion ივლისი 2005
    • Location Georgia
    Published in Projects
    ორშაბათი, 30 ოქტომბერი 2017 19:49

    Sakire Village Roads Rehabilitation

    Assessment of the road, development of road plans and road cover structure types.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance supervision of construction services.
    Sakire village roads have very high gradients and road width is narrowed due to local fences. Taking into consideration this particularity, road reinstatement technology was processed and road works comprised of Profiling/leveling, using coarse grained river gravel for road foundation, arrangement of culverts and ditches.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Construction
    • Start ივლისი 2005
    • Completion აგვისტო 2005
    • Location Georgia
    Published in Projects