Survey of structures and all associated bearing elements, define of construction requirements for ventilators installation, cables tracking on the wall, design of strengthening r/c slab and butt fitting, design of support frame, structures calculation from seismic impact point
Geodetic survey and geotechnical visual check was performed on PSG1 and PSG2 area. Design of reinforced concrete foundation for hazardous and non-hazardous landfills. Design of structural part and foundation of wheel barrow parking area structure.
Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
Supervision of construction services such as - graveling two yards with total area of 928km2 and fencing with barbed wire. Constructing two office modules, changing closet for personnel, catering module, toilets, and security booth. Concreting reinforced concrete slabs due to fuel tank and diesel generator placement. Installation of steel containers for material and tools storage. Installation of water pump; tracking power supply, water supply and se3wage systems. Arrangement of 1200m long and 5m wide landfill access gravel road.
Prepare plans of the existing facility. Determination of floor loading per square meter on the first floor of warehouse
Calculation the warehouse for 8 point seismic load in case the walls on the ground and first floors are demolished.
Determination of repair works scopes including concrete, carpentry, plastering, electrical and etc works.
Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
Supervision of construction services such as - cleaning and partially profiling road with area of 1200km2, arranging soil and reinforced concrete ditches; placing steel culverts at the yard entrances and road crossings; arranging reinforced concrete inlet and storm wells etc.
Performing reconnaissance works of North-South Gas Main passing through Georgia together with GGIC personnel. Due to planning survey and design work development producing survey and design packages, determining calendar schedule and estimate of survey and design works cost. Survey and design works include four main components: gas pipeline, geotechnical hazards, gas pipeline infrastructure, and environmental protection.
Drilling geotechnical boreholes, conducting laboratory analysis of soil samples. Possibilities to install and conduct various types of communications like low and high voltage power transmission lines, water supply system were determined. Relevant report development.
Design and arrangement of temporary dams at 6 small stream crossings in Bakuriani Districts, in order to avoid spread of potentially oil contaminated water. Dams represent sandbags and in order to ensure rigidity of the dam and undertake potential pressurization of water, they are placed in accordance to some specific rule and are fixed in with reinforcement.
Drilling boreholes of various depths (10-30m) in Tabatskuri and Bakuriani districts. Installation of piezometers to carry out monitoring of underground waters and contamination levels.
Assessment of the road, development of road plans and road cover structure types.
Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance supervision of construction services.
Sakire village roads have very high gradients and road width is narrowed due to local fences. Taking into consideration this particularity, road reinstatement technology was processed and road works comprised of Profiling/leveling, using coarse grained river gravel for road foundation, arrangement of culverts and ditches.