Find Project

    Filter by:

    • Search
    • Year
    • Client Name

    Georgian Gas Transmission Pipeline Rehabilitation TC – Technical and Environmental Survey

    Detailed technical specific surveys on the various sections of the Georgian Gas Transmission Pipeline which includes: geotechnical Inspection; pipeline corrosion, coating inspection; valves and gas distribution stations technical condition inspection; civil engineering inspection works; environmental baseline, audit and analysis.
    These studies will be carried out on 74% (a total of 222km) of the pipeline length covering the following sections:
    Section A – Kazbegi-Pasanauri
    Section B – Pasanauri-Saguramo
    Section C - Saguramo-Norio
    Section D – Norio-Tsiteli Khidi

    Project Details

    • Client Name: EBRD
    • Work Type: Survey, Investigation
    • Start: July 2006
    • Completion: November 2006
    • Location: Georgia
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    Search