Detailed technical specific surveys on the various sections of the Georgian Gas Transmission Pipeline which includes: geotechnical Inspection; pipeline corrosion, coating inspection; valves and gas distribution stations technical condition inspection; civil engineering inspection works; environmental baseline, audit and analysis.
These studies will be carried out on 74% (a total of 222km) of the pipeline length covering the following sections:
Section A – Kazbegi-Pasanauri
Section B – Pasanauri-Saguramo
Section C - Saguramo-Norio
Section D – Norio-Tsiteli Khidi