Design and construction works for water supply system of Bakuriani region, namely: geotechnical and survey works on route, determination of optimal route of the pipeline (3.5km), water supply system hydraulic report, including pipeline testing design; development of the design for headwork facility, water supply system construction, arrangement of headwork facility, one aerial crossing of river Tskhratskaro, one crossing of BTC pipeline route; installation of two reinforced concrete control wells and two reinforced concrete water supply regulation wells, testing of water supply system after construction, production of as-built documentation etc.