Spatial modelling of building carcass on cross and long seismic forces using program Lira, determination of the strength of earthquake the existing building shall resist, design of constructive measures to increase the building seismicity, calculation of the floor of the building on loads caused by transport movement.
Hydrological survey, hydraulic calculation of structures, structures bearing constructions design, access road design, and construction works scopes and schedules determination, construction works cost estimation.
Topographic survey of containment site at Tsikhisjvari – Oshora 2 and Iagluja landfill.
Drilling of 19 monitoring boreholes in Bakuriani district and arrangement of piezometers for continuous monitoring of underground waters and potential contamination levels.
Geotechnical investigation at six different sites. Drilling 135 m boreholes, conducting Lab tests for determination of mechanical, physical and chemical properties of soils and ground waters.
Test digs of foundations to assess the quality and strength of floors, test to determine the grade of the bitumen used on foundations surface, check joint quality between bearing precast structures, determine concrete grade of precast structures, check roof of buildings.
Trench line safety barrier construction, damage repair to essential services or structures, area clean-up and row clean-up, Akhaltsikhe and Tsalka Camps maintenance works, BV17, BV18, BV21 and BV22 maintenance works
Visual assessment of the road, development of road plans and road cover structure types.
Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
Supervision of construction services, such as - profiling/leveling the existing ground road sections and arrangement of sand-gravel layer, road side ditches and steel water pipes at yard entrances and road crossings.
Technical assessment of Tbilsresi Power Units #3,4 and 8 and determination of rehabilitation work scopes and costs.
Design and survey of Bakuriani Central (3,7 km) and Bypass Roads (3,0 km), topographic survey of both roads, design of road long and cross sections, determination of road cover structure types, development of detail drawings necessary for rehabilitation of bridges and culverts, design of concrete ditches and definition of rehabilitation work scopes and costs.
Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
Supervision of construction services, such as - rehabilitation of asphalt road (1,31 km long) and gravel road (1,1 km long) in Bakuriani, placement of reinforced concrete ditches and triangular concrete chutes on the asphalt roads and the repair of two bridge overpasses.