Scope of services includes design of protective structures (if necessary) and carry out their construction at river banks and crossings using riprap, gabions, Reno Mattresses and concrete/reinforced concrete structures. Production of relative as-built drawings. The contract is based on Call Offs.
By December, 2013 IDC Ltd has completed rehabilitation of 28 river crossings, where in total 56,613 m3 of soil were excavated, 33,409 m3 of riprap were arranged, 3,362 m3 of gabions and Reno Mattresses were installed. Total area of the construction works was 26,748 m2.
Also, 4 landslide areas were rehabilitated with total excavation volume of 7,577 m3 and installation of 4,202 m3 of gabions and Reno Mattresses.