    Scope of services included provision of senior surveyor, assistants to surveyors and skilled technician.

    Project Details

    • Client Name RSK Environment Ltd
    • Work Type Topographical Survey
    • Start August 2011
    • Completion September 2011
    • Location Georgia
    Published in Projects

    Provision of topographical works and services, production of situation plans and longitudinal profiles (as a baseline input for engineering design), provision of logistical and administrative services in connection with the above.

    Project Details

    • Client Name Holinger International Consultants GmbH
    • Work Type Topographical Survey
    • Start July 2011
    • Completion August 2011
    • Location Georgia
    Published in Projects
    Wednesday, 01 November 2017 18:44

    Shamkir River Remediation Work

    Managing QA/QC at the construction site – supervision of excavation, installation of formwork, backfilling and compaction, inspection of concrete at batching plant and on site, application of riprap, reinstatement, material control, warehouse auditing, supervision of preparation of all documents related to quality; managing commissioning system based on Guidance on Certification concept.

    Project Details

    • Client Name BP Exploration (Caspian Sea) Ltd. - Georgia
    • Work Type QA/QC
    • Start April 2011
    • Completion November 2011
    • Location Azerbaijan
    Published in Projects

    Scope of services includes design of protective structures (if necessary) and carry out their construction at river banks and crossings using riprap, gabions, Reno Mattresses and concrete/reinforced concrete structures. Production of relative as-built drawings. The contract is based on Call Offs.
    By December, 2013 IDC Ltd has completed rehabilitation of 28 river crossings, where in total 56,613 m3 of soil were excavated, 33,409 m3 of riprap were arranged, 3,362 m3 of gabions and Reno Mattresses were installed. Total area of the construction works was 26,748 m2.
    Also, 4 landslide areas were rehabilitated with total excavation volume of 7,577 m3 and installation of 4,202 m3 of gabions and Reno Mattresses.

    Project Details

    • Client Name BP Exploration (Caspian Sea) Ltd. - Georgia
    • Work Type Design, Construction
    • Start April 2011
    • Completion April 2014
    • Location Georgia
    Published in Projects

    Scope of services included provision of senior surveyor, assistants to surveyors and skilled technician.

    Project Details

    • Client Name RSK Environment Ltd
    • Work Type Topographical Survey
    • Start April 2011
    • Completion May 2011
    • Location Georgia
    Published in Projects
    Wednesday, 01 November 2017 18:34

    Office Building

    Execution of topographical and geotechnical surveys, detail design of the building, which included all elements of the building, such as structural, mechanical, HVAC, electrical etc.
    Construction of three story office with total area of 900 sq.m. Works included earth works for foundation, installation of foundation slab, columns, beams and ceiling slab with r/c structures, hydro insulation of foundation and ceiling slab, arrangement of walls and partitions with various materials, their plastering and painting, installation of windows and doors, installation of water supply, sewerage and power networks, arrangement of bathrooms and toilets, arrangement of flooring, heating/ventilation/air conditioning, computer and phone networks, window jalousies, provision of office furniture. Pavement of 2,000 m2 yard with reinforced concrete.

    Project Details

    • Client Name IDC Ltd
    • Work Type Design, Construction, Survey
    • Start October 2010
    • Completion July 2012
    • Location Georgia
    Published in Projects

    Scope of services includes monitoring topographic survey of SM and DM existing on the landslide sections and faulty zones alongside the AGT Pipelines in Georgia (in Krassovsky 1940 absolute coordinate system). Topographic works are carried out with Total Stations after which new data or Monuments are compared to that of old ones. In total baseline survey of 204 existing monuments should be carried out.
    Scope of services includes monitoring topographic survey of new SM and DM on the landslide sections and faulty zones alongside the AGT & WREP Pipelines in Georgia (in Krassovsky 1940 absolute coordinate system). Topographic works are carried out with Total Stations & GPS after which new data or Monuments are compared to that of old ones. In total baseline survey of 204 existing monuments should be carried out.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Topographical Survey
    • Start August 2010
    • Completion December 2010
    • Location Georgia
    Published in Projects
    Wednesday, 01 November 2017 18:28

    PSG2 Permanent Accommodation Design

    Geotechnical and topographic survey, vertical planning. Design of: drainage for rainwater runoff, hot and cold water distribution system, architectural design including finishes, layout, windows, doors, etc, structural design, concrete roads and pavements per BTC standards.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design, Survey
    • Start April 2010
    • Completion February 2011
    • Location Georgia
    Published in Projects

    Drilling of boreholes, 60 l.m., geotechnical reconnaissance of research area, topographical survey of approximately 60-hectare area (scale 1:1000), production of report.

    Project Details

    • Client Name ABB
    • Work Type Preliminary Survey, Production of report
    • Start March 2010
    • Completion March 2010
    • Location Georgia
    Published in Projects

    Supervision for upgrading Km 0 - -Km 27 and Km 27 – Km 54 section of Vaziani-Gombori-Telavi Road.
    IDC Ltd acted as a “Local Associate” of MMM Group limited (“Lead Consultant”). Works were conducted in accordance of FIDIC guidelines and included supervision of: road rehabilitation, arrangement of bridges, gabions, retaining walls, water drainage and reinforced concrete channels.

    Project Details

    • Client Name MMM Group
    • Work Type Supervision
    • Start January 2010
    • Completion June 2012
    • Location Georgia
    Published in Projects