Design and Construction reinforced concrete foundations of the shelter for generators at SCP Area 80.
Construct and install the vault from prefabricated reinforcement concrete structures for the 4” SCP valve outside of PSG2.
Emergency repair works of six buildings located in Tbilisi for temporary accommodation of refugees.
Arrange and provide magnet surveys on Western Route Export Pipeline river crossings and line section from PRS1 to KP370.
Performing different minor construction works and periodical provision with construction equipment per the company’s request.
In order to enhance the integrity of the Western Route Export Pipeline crossing, emergency repair was carried out. 350 cub.m. Riprap was placed alongside Khanistskali river crossing with the pipeline.
Reinforced concrete foundation was designed and constructed at PSG-1 CWAA area. C35 concrete was used for the foundation. 50m long access road to the r/c foundation was arranged.
The services are performed along BTC and WREP Oil Pipelines, SCP Gas Pipeline and at BP’s facilities, including pump stations, pressure reduction stations, PSG1, PSG2, pipelines right of way, valve stations, river crossings, Supsa terminal, storage yards etc.
The services include - road repair, gravel work, equipment repair, response to land slips and other erosion-related emergencies, remedial works, manual handling, small civil constriction works provision of laborers, provide and maintain winter access to a set number of block and check valves, provision of materials, equipment, plant and machinery, transportation services for heavy and light loads
Assessment of buildings bearing structures, determination of existing damages (if any). Recommendations issue about antennas installation on the buildings taking into account their structural integrity.