Find Project

    Filter by:

    • Search
    • Year
    • Client Name

    Temporary Secondary Containment – Kodiana Sector

    Design and arrangement of temporary dams at 6 small stream crossings in Bakuriani Districts, in order to avoid spread of potentially oil contaminated water. Dams represent sandbags and in order to ensure rigidity of the dam and undertake potential pressurization of water, they are placed in accordance to some specific rule and are fixed in with reinforcement.

    Project Details

    • Client Name: BP/BTC Co
    • Work Type: Construction
    • Start: June 2005
    • Completion: August 2005
    • Location: Georgia
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    Search