    Design of Soil Cover Increasing on Old Sections of WREP (KP44 – KP50)

    Topographic survey works and office data processing, determination of several alternative options for ground work scopes needed to increase ground layer thickness above pipe (by 60, 70 or 80 cm); development of proposed work scopes list and design of culvert to ensure normal operable conditions of the earth road at KP46+179.

    Project Details

    • Client Name: Georgian Pipeline Company
    • Work Type: Detail design, Field Survey
    • Start: March 2003
    • Completion: March 2003
    • Location: Georgia