Liakhvi River Rehabilitation

Design / Construction

Liakhvi River Rehabilitation

Client
BP Exploration
Work Type
Design / Construction
Location
Georgia
Project Status
completed
Start Date
2014-07-27
End Date
2015-02-27

Liakhvi River Rehabilitation

Design of rehabilitation measures of Liakhvi river crossing, site preparation, 68 868 m3 soil excavation, 15 000 m2 geotextile filter layer installation, 19 043 m3 riprap installation to armour the river banks, 21 320 m3 riprap installation for arrangement of threshold across the river bed, 24 290 m3 excavated soil backfill and installation of fill, installation of dam with 2 810 m3 local sand/gravel, distribution of 40 374 m3 surplus soil within the river bed and at riverside slopes, supply and delivery of 34 460 m3 of stones, site reinstatement, preparation of as-built drawings.

Looking to Execute a Similar Project?

Partner with IDC to bring your next infrastructure, energy, or industrial project to life. With decades of proven experience and a commitment to quality, safety, and precision, we’re ready to help you achieve outstanding results.

Get in touch

Similar projects

Investigation | Design | Construction | Supervision