Parking Expansion

Parking Expansion
IDC successfully completed the car parking arrangement project for the US Embassy. The scope of work included the provision and installation of 120 l.m. of metal fence sections and modification of the existing fence, fabrication and installation of an automatized sliding door, and installation of a metal frame LGF booth. Additionally, IDC constructed a storm water drainage system for the parking area, including connection to the existing system and construction of a storm water collector pit with metal grills. The area was prepared and paved with 800 sq.m of asphalt, and vehicle stopper barriers were installed and painted to complete the project.