Erosion Measures and Bridge Crossing over r. Satskhenisi Design

Client
BTC Co
Work Type
Survey, Design
Location
Georgia
Project Status
Completed
Start Date
2006-11-27
End Date
2007-12-27
Erosion Measures and Bridge Crossing over r. Satskhenisi Design
Visual inspection of 28 erosive sites along Baku-Supsa oil pipeline, in case of need, detail topographic and geotechnical survey, design of erosion measures (arranging dams, berms, drainage channels, retaining walls etc). Carrying out detail topographical and geotechnical investigations, bridge design over r. Satskhenisi