Provision of BTC/SCP/WREP river crossing rehabilitation works

Design / Construction

Provision of BTC/SCP/WREP river crossing rehabilitation works

Client
BP Exploration
Work Type
Design / Construction
Location
Georgia
Project Status
completed
Start Date
2011-04-27
End Date
2014-04-27

Provision of BTC/SCP/WREP river crossing rehabilitation works

Scope of services includes design of protective structures (if necessary) and carry out their construction at river banks and crossings using riprap, gabions, Reno Mattresses and concrete/reinforced concrete structures. Production of relative as-built drawings. The contract is based on Call Offs.Within this project IDC Ltd completed rehabilitation of 28 river crossings, where in total 56,613 m3 of soil were excavated, 33,409 m3 of riprap were arranged, 3,362 m3 of gabions and Reno Mattresses were installed. Total area of the construction works was 26,748 m2.Also, 4 landslide areas were rehabilitated with total excavation volume of 7,577 m3 and installation of 4,202 m3 of gabions and Reno Mattresses.

Looking to Execute a Similar Project?

Partner with IDC to bring your next infrastructure, energy, or industrial project to life. With decades of proven experience and a commitment to quality, safety, and precision, we’re ready to help you achieve outstanding results.

Get in touch

Similar projects

Investigation | Design | Construction | Supervision