Investigation | Design | Construction | Construction Supervision

    Find Project

    Filter by:

    • Search
    • Year
    • Client Name

    Projects

    Geotechnical Survey on the Territory of Tbilisi Tuberculosis Center

    Drilling of 4 boreholes (19m of total length) within Tbilisi Tuberculosis Center, soil laboratory testing, drafting geotechnical report.

    Project Details

    • Client Name Caucasus Consulting Group
    • Work Type Geotechnical Survey
    • Start January 2009
    • Completion January 2009
    • Location Georgia

    Containers Strengthening at PSG1

    Fixing 36 office containers with special steel elements on the pre-arranged concrete blocks.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design, Construction
    • Start October 2008
    • Completion November 2008
    • Location Georgia

    Construction of Shelter for Generators at South Caucasus Pipeline Area 80

    Design and Construction reinforced concrete foundations of the shelter for generators at SCP Area 80.

    Project Details

    • Client Name CMB Developments LTD
    • Work Type Design, Construction
    • Start October 2008
    • Completion December 2008
    • Location Georgia

    Provision of Concrete Valve Pit for 4” valve on PSG2 SCP

    Construct and install the vault from prefabricated reinforcement concrete structures for the 4” SCP valve outside of PSG2.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start September 2008
    • Completion November 2008
    • Location Georgia

    Buildings Repair works

    Emergency repair works of six buildings located in Tbilisi for temporary accommodation of refugees.

    Project Details

    • Client Name Care International
    • Work Type Construction
    • Start September 2008
    • Completion October 2008
    • Location Georgia

    Magnet Survey

    Arrange and provide magnet surveys on Western Route Export Pipeline river crossings and line section from PRS1 to KP370.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Survey
    • Start August 2008
    • Completion October 2008
    • Location Georgia

    Provision of Civil Works and Equipment for BTC/SCP in Georgia

    Performing different minor construction works and periodical provision with construction equipment per the company’s request.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction, Equipment Provision
    • Start June 2008
    • Completion September 2008
    • Location Georgia

    Rectification Work at WREP Khanistskali River Crossing

    In order to enhance the integrity of the Western Route Export Pipeline crossing, emergency repair was carried out. 350 cub.m. Riprap was placed alongside Khanistskali river crossing with the pipeline.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start May 2008
    • Completion June 2008
    • Location Georgia

    Reinforced Slab Detail Design/Construction and Access Road Arrangement at PSG 1

    Reinforced concrete foundation was designed and constructed at PSG-1 CWAA area. C35 concrete was used for the foundation. 50m long access road to the r/c foundation was arranged.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Detail design, Construction
    • Start March 2008
    • Completion May 2008
    • Location Georgia

    Hotel Design

    Reconstruction of t. Gurjaani wine factory administrative building to hotel facility. The work includes: architectural design, structural calculations of bearing elements, design of water supply, sewerage, and heating-ventilation and power supply networks, interior design. Also, tennis courts, sauna and other recreation facilities within the hotel complex.

    Project Details

    • Client Name JSC Zegaani
    • Work Type Detail design
    • Start September 2007
    • Completion December 2007
    • Location Georgia

    Design of Underground Passage on V. Gorgasali Square in Tbilisi

    Design of underground passage on V. Gorgasali square, the passage comprises of r/c gallery, dome cladding and entrance/exit.
    The detail design includes structural design of the passage based on the architecture in view of underground utility locations.
    The bearing elements of the passage were calculated per the shallow-depth tunnel scheme. The formwork and reinforcing drawings, water supply system for fire hydrants were developed and excavation strengthening structure was distinguished.

    Project Details

    • Client Name Nola Ltd
    • Work Type Detail design
    • Start August 2007
    • Completion October 2007
    • Location Georgia

    Repairs to Community Roads (Packages 1& 2)

    Management of construction services, such as - cleaning/reinstating existing concrete ditches and pipes, leveling road bed, reinstating the damaged asphalt cover, removing deformed sub layer and damaged and cracked asphalt, arranging of asphalt layer, repairing concrete ditches and culverts, arranging new culverts, marking the cover etc on eight asphalt roads with approximate total length 27km in Gardabani, Marneuli and Tetritskaro Districts.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start June 2007
    • Completion December 2007
    • Location Georgia

    Provision of Civil Services

    The services are performed along BTC and WREP Oil Pipelines, SCP Gas Pipeline and at BP’s facilities, including pump stations, pressure reduction stations, PSG1, PSG2, pipelines right of way, valve stations, river crossings, Supsa terminal, storage yards etc.
    The services include - road repair, gravel work, equipment repair, response to land slips and other erosion-related emergencies, remedial works, manual handling, small civil constriction works provision of laborers, provide and maintain winter access to a set number of block and check valves, provision of materials, equipment, plant and machinery, transportation services for heavy and light loads

    Project Details

    • Client Name BP Exploration (Caspian Sea) Ltd. - Georgia
    • Work Type Provision of Civil Services for BTC/SCP and WREP in Georgia
    • Start April 2007
    • Completion January 2009
    • Location Georgia

    Manufacturing and Installation of Sluice Gate at Potskovi River Crossing

    Sluice gate fabrication, sluice gate R/C precast structure fabrication, trench excavation, earth dam arrangement, covering water diverter with riprap, arranging key wall with riprap

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design, Construction
    • Start March 2007
    • Completion June 2007
    • Location Georgia

    Investigation at PSG1 for OSRB

    In total up to 30 m boreholes drilling at PSG1 for OSRB, core sampling, topographic survey works fulfilment, ground samples, laboratory testing, field and lab geotechnical data processing, field topographic data processing, relative recommendation development, report development.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Report Development, Survey
    • Start March 2007
    • Completion June 2007
    • Location Georgia

    Company Warehouse Upgrade

    Lift shaft strengthening and hydraulic lift installation, which comprises if two main elements: 16m high lift shaft strengthening with prefabricated steel elements, reinforced concrete plain roof arrangement on the lift shaft, lift rails and lift installation.
    Drainage system and Reinforced Concrete Slab Arrangement: demolish existing 500sq.m. R/C slab in the BTC OPS yard, 20 cm thickness crushed rock layer arrangement and compaction, 20 cm thickness in city cast R/C slab arrangement, waterproof sealant application between the R/C slab sections.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start March 2007
    • Completion December 2007
    • Location Georgia

    Design Works Rail Crossing Access to PSG2

    Topographic survey at rail crossing 1n1:500 scale both railroad and vehicle road sections inclusive. Vehicle roads CBR testing. Design of Railroad crossing features and vehicle road cover design. Report Development.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design, Survey
    • Start February 2007
    • Completion May 2007
    • Location Georgia

    Structural Integrity Assessment of buildings, located in Georgia

    Assessment of buildings bearing structures, determination of existing damages (if any). Recommendations issue about antennas installation on the buildings taking into account their structural integrity.

    Project Details

    • Client Name Communications New Technologies
    • Work Type Survey
    • Start February 2007
    • Completion March 2008
    • Location Georgia

    Minor Works on Call-Off Basis

    Recovering works and maintenance at BV12; Refuelling at GB 21; Rock salt delivery from Rustavi pipe yard to PSG: Fabrication of fuel container and its transportation to Rustavi pipe yard; Provision of Water Tanker for PSG 1.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Maintenance, Procurement/Fabrication
    • Start February 2007
    • Completion March 2007
    • Location Georgia

    Provision of Secondary Containment Structure Redesign

    Redesign of bank revetments and river-bed landscape due to environmental fitness. Redesign of Reinforced Concrete Sluice Gates Structures. Earth, gabion walls, riprap, road covers, r/c structures etc. work scopes development.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Detail design
    • Start February 2007
    • Completion March 2007
    • Location Georgia

    Helipad Area Rehabilitation in Akhaltsikhe

    Removal 50cm cover (concrete and crushed rock) from the helipad area and 5sm thickness gravel cover from the adjacent road. Debris removal on Akhaltsikhe landfill. Area spreading by bulldozer and grader.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start February 2007
    • Completion February 2007
    • Location Georgia

    Erosion Measures and Bridge Crossing over r. Satskhenisi Design

    Visual inspection of 28 erosive sites along Baku-Supsa oil pipeline, in case of need, detail topographic and geotechnical survey, design of erosion measures (arranging dams, berms, drainage channels, retaining walls etc). Carrying out detail topographical and geotechnical investigations, bridge design over r. Satskhenisi.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design, Survey
    • Start November 2006
    • Completion December 2007
    • Location Georgia

    Geotechnical Investigations in Gardabani District

    More than 100lm length borehole drilling, piezometers installation, lab determination of soils bulk and particle density, report development.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Report Development, Survey
    • Start September 2006
    • Completion September 2006
    • Location Georgia

    Temporary Bank Revetment Design on Kura West in Azerbaijan

    Based of geotechnical and hydrological investigation and topographic survey data, temporary bank revetment is designed to protect the WREP pipeline on this section of the ROW.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design
    • Start September 2006
    • Completion November 2006
    • Location Azerbaijan

    Additional Construction Works for R/C Slabs on CWAA at PSG 1

    Additional minor construction works, including small concrete block and brick walls construction, etc, are being carried out on the reinforced concrete slabs on the CWAA area at PSG 1.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start September 2006
    • Completion November 2006
    • Location Georgia

    Water Pipeline construction in V. Andeziti (1,6km Length)

    Design and construction works for water supply system of Bakuriani region, v. Andeziti, namely: geotechnical and survey works on route, determination of optimal route of the pipeline (1,2km length)), water supply system hydraulic report, including pipeline testing design; development of the design for headwork facility. Water supply system construction from 150mm diameter steel and plastic pipes, arrangement of reinforced concrete headwork facility.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Detail design, Construction
    • Start August 2006
    • Completion November 2006
    • Location Georgia

    Georgian Gas Transmission Pipeline Rehabilitation TC – Technical and Environmental Survey

    Detailed technical specific surveys on the various sections of the Georgian Gas Transmission Pipeline which includes: geotechnical Inspection; pipeline corrosion, coating inspection; valves and gas distribution stations technical condition inspection; civil engineering inspection works; environmental baseline, audit and analysis.
    These studies will be carried out on 74% (a total of 222km) of the pipeline length covering the following sections:
    Section A – Kazbegi-Pasanauri
    Section B – Pasanauri-Saguramo
    Section C - Saguramo-Norio
    Section D – Norio-Tsiteli Khidi

    Project Details

    • Client Name EBRD
    • Work Type Survey, Investigation
    • Start July 2006
    • Completion November 2006
    • Location Georgia

    Design of Sluice Gate in Potskovi River

    Design of a sluice gate for irrigation channel at r. Potkhovi-2 crossing of the BTC pipeline, including field topographic survey, geotechnical investigations, laboratory testing of soils, hydrological calculations, and detail design of the sluice gate and spillway.

    Project Details

    • Client Name Amec Spie – Petrofac International LTD
    • Work Type Design, Survey
    • Start July 2006
    • Completion August 2006
    • Location Georgia

    R/c Slab Integrity Assessment, Topographic and Geotechnical Survey on CWAA at PSG 1.

    Field Topographic and Geotechnical Survey on CWAA at PSG 1, laboratory testing of physical/mechanical characteristics of soils, identification of existing r/c slab concrete grade and reinforcement design; r/c slab calculation for vehicle load, and development of slab strengthening recommendations.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Report Development, Survey
    • Start July 2006
    • Completion August 2006
    • Location Georgia

    Call-Off agreement for services for Kodiana Projects

    Provision of different professionals (civil engineers, surveyors, geologists, hydrologists etc) for Kodiana Projects on the basis of call-off agreement.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design, Survey
    • Start June 2006
    • Completion December 2007
    • Location Georgia

    GB21 Access Road Detailed Design

    Detail design of 2.2km long access road to GB21. For narrowing the gradients and selecting best road cover, three options were developed. Among the developed options, option II was considered most feasible, in case of which maximum gradient did not exceed 22%, which ensured more safe movement compared to option I and III.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design, Survey
    • Start June 2006
    • Completion July 2006
    • Location Georgia

    Provision of Access Roads (Package C), Kodiana Sector (Package C)

    Provision of equipment, manpower and materials for the repair of existing roads and tracks in the Kodiana area of Georgia.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start April 2006
    • Completion May 2006
    • Location Georgia

    Structural Survey and Improvement Measures Development Tsalka Hotel

    Survey of guesthouse in Tsalka and all associated bearing elements, define of construction requirements for ventilators installation, cables tracking on the wall, strengthening the foundation, seismic stability determination and calculation in software complex LIRA.

    Project Details

    • Client Name GSS Ltd
    • Work Type Report Development, Survey
    • Start May 2006
    • Completion June 2006
    • Location Georgia

    Redesign of Kojori-Ninotsminda Road Section (18km length)

    Redesign of road cover, Work scopes and cost estimate determination.

    Project Details

    • Client Name The State Department of Roads of Georgia/WB Transport Reform and Rehabilitation Center
    • Work Type Detail design
    • Start April 2006
    • Completion May 2006
    • Location Georgia

    Survey of Secondary Roads of Georgia

    Chokhatauri-Ozurgeti –Batumi and Zugdidi-Anaklia Roads (total length – 120 km) Survey in 1:1000 scale, Poligonometry.

    Project Details

    • Client Name INOCSA Ingeneria
    • Work Type Survey
    • Start March 2006
    • Completion May 2006
    • Location Georgia

    Provision of Iagluja Landfill Conditioning Plan Implementation

    Approximately 2 km length fence installation around the waste area, Arrangement of 1,28km gravel road and 2250 m2 waste disposal area.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start March 2006
    • Completion May 2006
    • Location Georgia

    BTC OPC Warehouse and Office Upgrade

    Security hut, perimeter wall, heated and lean-to area, first floor Strengthening, lift shaft strengthening, yard drainage system, main entrance door design.
    Main entrance door and rigidity frame assembling design.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design
    • Start February 2006
    • Completion October 2006
    • Location Georgia

    Facility and Drainage Design

    In order to condition Iagluja landfill area camp design is being developed covering dwelling modules, catering place, lockers and fuel storage area. Drainage, power supply and potable water networks are being deigned as well.
    Besides, about 1200m long water diversion system of reinforced/concrete chutes and steel pipes is being designed. The system objective is to avoid filtration of the water flown down the slopes in the landfill.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design
    • Start March 2006
    • Completion June 2006
    • Location Georgia

    Rustavi Internal Road Rehabilitation (2,3km length)

    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
    Supervision of construction services such as -
    cleaning/reinstating existing concrete ditches and pipes, leveling road bed, reinstating the damaged asphalt cover, removing deformed sub layer and damaged and cracked asphalt, arranging of asphalt layer, repairing concrete ditches and culverts, marking the cover etc

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start January 2006
    • Completion December 2006
    • Location Georgia

    Provision of Energy Expertise for BP

    Gardabani mazut storage site inspection, condition survey of underground and above ground mazut storage tanks, mazut low and high-pressure heaters, electrical network, mazut discharge facilities, pumps, etc.

    Project Details

    • Client Name BP Exploration (Caspian Sea) Ltd. - Georgia
    • Work Type Survey
    • Start January 2006
    • Completion January 2006
    • Location Georgia

    Provision of Minor Winter Works

    Provide and maintain access roads (total length approximately 25km) to a set number of Block and Check Valves sites on the western section in conjunction with maintaining life services and support to the physical security assets that are deployed to the Block and Check Valves.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Maintenance
    • Start November 2005
    • Completion March 2006
    • Location Georgia

    Redesign Six Secondary Oil Containment Structures and Tori Access Road Design

    Architectural design of structure surfaces. Design of generators or heavy capacity batteries storage area in structures’ lower bay. Design of bank revetments and river-bed landscape due to environmental fitness. Hydrological recalculation of cross hydraulic structures in case of lack of orifices.
    Topographic and geotechnical survey of 9km long Tori access road, hydrological surveys, design of gravel road structure and artificial structures (design of three small bridges and 32 culverts).

    Project Details

    • Client Name BP/BTC Co
    • Work Type Detail design
    • Start October 2005
    • Completion November 2005
    • Location Georgia

    Structural Survey/Assurance & Requirements for New BTC Warehouse Area

    Survey of structures and all associated bearing elements, define of construction requirements for ventilators installation, cables tracking on the wall, design of strengthening r/c slab and butt fitting, design of support frame, structures calculation from seismic impact point

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design, Structural Study
    • Start October 2005
    • Completion November 2005
    • Location Georgia

    Design of the hazardous waste accommodation areas and foundations for chems and lubes storage sheds for PSG1 and PSG2

    Geodetic survey and geotechnical visual check was performed on PSG1 and PSG2 area. Design of reinforced concrete foundation for hazardous and non-hazardous landfills. Design of structural part and foundation of wheel barrow parking area structure.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Detail design, Field Survey
    • Start September 2005
    • Completion November 2005
    • Location Georgia

    Temporary Construction Camp and Gravel Road Construction at Iagluja Landfill Area

    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
    Supervision of construction services such as - graveling two yards with total area of 928km2 and fencing with barbed wire. Constructing two office modules, changing closet for personnel, catering module, toilets, and security booth. Concreting reinforced concrete slabs due to fuel tank and diesel generator placement. Installation of steel containers for material and tools storage. Installation of water pump; tracking power supply, water supply and se3wage systems. Arrangement of 1200m long and 5m wide landfill access gravel road.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start October 2005
    • Completion November 2005
    • Location Georgia

    Detailed Scope of Work and Cost Estimation for BTC Ops Warehouse Repairing Works

    Prepare plans of the existing facility. Determination of floor loading per square meter on the first floor of warehouse
    Calculation the warehouse for 8 point seismic load in case the walls on the ground and first floors are demolished.
    Determination of repair works scopes including concrete, carpentry, plastering, electrical and etc works.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Structural Study, Repair Works Scopes development
    • Start June 2005
    • Completion August 2005
    • Location Georgia

    Minadze Road Rehabilitation

    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
    Supervision of construction services such as - cleaning and partially profiling road with area of 1200km2, arranging soil and reinforced concrete ditches; placing steel culverts at the yard entrances and road crossings; arranging reinforced concrete inlet and storm wells etc.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Project Management
    • Start June 2005
    • Completion July 2005
    • Location Georgia

    The Provision of Technical Expertise to Georgian Gas International Corporation (GGIC)

    Performing reconnaissance works of North-South Gas Main passing through Georgia together with GGIC personnel. Due to planning survey and design work development producing survey and design packages, determining calendar schedule and estimate of survey and design works cost. Survey and design works include four main components: gas pipeline, geotechnical hazards, gas pipeline infrastructure, and environmental protection.

    Project Details

    • Client Name BP Exploration (Caspian Sea) Ltd. - Georgia
    • Work Type Feasibility Study
    • Start June 2005
    • Completion September 2005
    • Location Georgia

    Geotechnical Investigation and Services Assessment to Borjomi OSR Base

    Drilling geotechnical boreholes, conducting laboratory analysis of soil samples. Possibilities to install and conduct various types of communications like low and high voltage power transmission lines, water supply system were determined. Relevant report development.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start June 2005
    • Completion August 2005
    • Location Georgia

    Temporary Secondary Containment – Kodiana Sector

    Design and arrangement of temporary dams at 6 small stream crossings in Bakuriani Districts, in order to avoid spread of potentially oil contaminated water. Dams represent sandbags and in order to ensure rigidity of the dam and undertake potential pressurization of water, they are placed in accordance to some specific rule and are fixed in with reinforcement.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start June 2005
    • Completion August 2005
    • Location Georgia
    Page 2 of 4
    © 2002-2019 IDC Ltd. All Rights Reserved. Developed By GT-studio

    Search