    WREP Rustavi Fault Crossing Engineering Measures Development (KP479)

    Design works in order to improve pipeline operable conditions at KP479,7 from Baku tectonic fault crossing of Georgian Section of WREP.

    Design works: F5,3 ha field topographic survey, geotechnical and laboratory works, pipeline burial depth determination, desktop processing, development of the design to provide re-grading of soil cover on the 200m section of the pipeline also to enable effective drainage of rainwater by rip-rap channels; determination of relevant ground works scopes; reduce soil cover to 0.9m over the pipeline in order to improve pipe working under seismic loads

    Project Details

    • Client Name Georgian Pipeline Company
    • Work Type Detail design, Field Survey
    • Start March 2003
    • Completion March 2003
    • Location Georgia

    Design of Soil Cover Increasing on Old Sections of WREP (KP44 – KP50)

    Topographic survey works and office data processing, determination of several alternative options for ground work scopes needed to increase ground layer thickness above pipe (by 60, 70 or 80 cm); development of proposed work scopes list and design of culvert to ensure normal operable conditions of the earth road at KP46+179.

    Project Details

    • Client Name Georgian Pipeline Company
    • Work Type Detail design, Field Survey
    • Start March 2003
    • Completion March 2003
    • Location Georgia