    Provision of GWM Well Installation

    Drilling boreholes of various depths (10-30m) in Tabatskuri and Bakuriani districts. Installation of piezometers to carry out monitoring of underground waters and contamination levels.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey
    • Start June 2005
    • Completion July 2005
    • Location Georgia

    Sakire Village Roads Rehabilitation

    Assessment of the road, development of road plans and road cover structure types.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance supervision of construction services.
    Sakire village roads have very high gradients and road width is narrowed due to local fences. Taking into consideration this particularity, road reinstatement technology was processed and road works comprised of Profiling/leveling, using coarse grained river gravel for road foundation, arrangement of culverts and ditches.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Construction
    • Start July 2005
    • Completion August 2005
    • Location Georgia

    Tsalka Internal Roads Rehabilitation (9.6km length)

    Assessment of the road, development of road plans and road cover structure types.
    Supervision of construction services, such as - cleaning/reinstating existing concrete ditches and pipes, leveling road bed, reinstating the damaged asphalt cover, removing deformed sub layer and damaged and cracked asphalt, arranging of asphalt layer, repairing concrete ditches and culverts, arranging new culverts, marking the cover etc.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Construction
    • Start February 2005
    • Completion December 2005
    • Location Georgia

    Bakuriani Central Road (1.29km length) and Bypass Road (3km length) Rehabilitation

    Rehabilitation measures revision.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
    Supervision of construction services, such as - cleaning/reinstating existing concrete ditches, arranging r/c roadside ditches, reinstating the damaged asphalt cover, removing deformed cover and foundation, arranging of asphalt layer, replacement of bridge cover and water culvert pipes, arranging road shoulders etc.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Construction
    • Start February 2005
    • Completion August 2005
    • Location Georgia

    Lemshveniera Road Rehabilitation

    Assessment of the road, development of road plans and road cover structure types.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
    Supervision of construction services, such as - cleaning/reinstating existing concrete ditches, earth and gravelling works, arranging water culvert pipes, reinstating the damaged asphalt cover, removing damaged and cracked asphalt, arranging of asphalt lower and upper layers, using geotextile Terram 1500 to strengthen road foundation at some specific sections, arranging road shoulders and parapets.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Construction
    • Start February 2005
    • Completion July 2005
    • Location Georgia

    Rehabilitation of Iagluja Landfill Access Road (0,4km length)

    Assessment of the road, development of road plans and road cover structure types.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
    Supervision of construction services, such as - cleaning the existing road from extra soil, profiling ground layer and road surface, restoring the road base with sand/gravel mix, arranging road cover with sand/gravel mix/asphalt concrete, arranging stone barriers and road signs.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Construction
    • Start March 2005
    • Completion April 2005
    • Location Georgia

    Ten Bridges Current Structural Assessment in Tbilisi

    Bridges technical condition visual assessment, concrete grade and cracks width determination, bridges bearing structures conditions assessment, rehabilitation measures recommendations development (e.g. special testing, detailed design, and rehabilitation works types.)

    Project Details

    • Client Name Tbilisi City Council Maintenance Department
    • Work Type Structural Study
    • Start March 2005
    • Completion April 2005
    • Location Georgia

    Structural Survey of WREP Exports/PU Warehouse

    Preparation of plans of existing facility, assessment/provision of detailed scope of works for existing lifts, determination of floor loading per square meter, calculation of the warehouse for 8 point seismic load using program “Lira”

    Project Details

    • Client Name BP/BTC Co
    • Work Type Structural Study
    • Start March 2005
    • Completion March 2005
    • Location Georgia

    Tetritskaro Entrance Road (3,0 km length) and Bypass Road (2,0km Length) Rehabilitation

    Visual assessment of the road, development of road plans and road cover structure types.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
    Supervision of construction services, such as - cleaning/reinstating existing concrete ditches, earth and gravelling works, arranging water culvert pipes, reinstating the damaged asphalt cover, removing damaged and cracked asphalt, arranging of asphalt layer, arranging road shoulders and parapets etc.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Construction
    • Start February 2005
    • Completion October 2005
    • Location Georgia

    Detailed Survey of Overhead Power Lines Along the BTC Pipeline ROW

    Study of all power lines and cables, their ownership, voltage, KP of power line crossing, GPS grid reference, height of power lines across the ROW.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Data Development
    • Start February 2005
    • Completion March 2005
    • Location Georgia

    Maintenance Works at Rustavi Pipe Yard

    Installation of Electrical Lighting, Installation and Dismantling of a Portable Toilet, Rent of Generator, Security Shack, Changing Room

    Project Details

    • Client Name Seacor Environmental Services International
    • Work Type Maintenance
    • Start February 2005
    • Completion May 2005
    • Location Georgia

    Installation of Monitoring Boreholes at HDD Site

    Installation of six monitoring boreholes and piezometers for continuous monitoring of underground water levels on river Mtkvari.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey
    • Start February 2005
    • Completion March 2005
    • Location Georgia

    Survey of Kura River Downstream of Crossing Site at KP 223 for Design of Village Protection Works

    Topographic survey of Kura river downstream of crossing site at KP 223 using Total Station equipment for design of village protection works.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Drawings Development
    • Start February 2005
    • Completion February 2005
    • Location Georgia

    Provision of Basic Survey Data for Kura West River Crossing and Hydrological Data for Kura East River Crossing

    Topographic survey of Kura West River crossing, Obtaining hydrological data for Kura East River crossing.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start February 2005
    • Completion February 2005
    • Location Georgia

    Geodetic Survey and Installation of Monitoring Wells at Iagluja

    Drilling boreholes and arrangement of piezometers for underground water encountering and water level monitoring purposes. Taking water and soil samples and carry out lab analysis, arrangement of monuments for monitoring the land-slide area.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start January 2005
    • Completion January 2005
    • Location Georgia

    Structural and Geotechnical Assessment of Proposed Warehouse Space

    Spatial modelling of building carcass on cross and long seismic forces using program Lira, determination of the strength of earthquake the existing building shall resist, design of constructive measures to increase the building seismicity, calculation of the floor of the building on loads caused by transport movement.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Structural Study
    • Start December 2004
    • Completion March 2005
    • Location Georgia

    Detail Design of Secondary Oil Containment Structures for BTC Pipeline

    Hydrological survey, hydraulic calculation of structures, structures bearing constructions design, access road design, and construction works scopes and schedules determination, construction works cost estimation.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Works, Detail design
    • Start December 2004
    • Completion February 2005
    • Location Georgia

    Topographic Survey of Containment Site at Tsikhisjvari and Landfill at Iagluja

    Topographic survey of containment site at Tsikhisjvari – Oshora 2 and Iagluja landfill.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Drawings Development
    • Start October 2004
    • Completion October 2004
    • Location Georgia

    Boreholes for Piezometer Installation

    Drilling of 19 monitoring boreholes in Bakuriani district and arrangement of piezometers for continuous monitoring of underground waters and potential contamination levels.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey
    • Start November 2004
    • Completion November 2004
    • Location Georgia

    Geotechnical Investigation for the Design of Oil Containment Structures for BTC Pipeline

    Geotechnical investigation at six different sites. Drilling 135 m boreholes, conducting Lab tests for determination of mechanical, physical and chemical properties of soils and ground waters.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start October 2004
    • Completion December 2004
    • Location Georgia

    Structural Survey of three Warehouses in Tbilisi, Alekseevka

    Test digs of foundations to assess the quality and strength of floors, test to determine the grade of the bitumen used on foundations surface, check joint quality between bearing precast structures, determine concrete grade of precast structures, check roof of buildings.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Structural Study
    • Start October 2004
    • Completion November 2004
    • Location Georgia

    Pipeline Construction Support Services

    Trench line safety barrier construction, damage repair to essential services or structures, area clean-up and row clean-up, Akhaltsikhe and Tsalka Camps maintenance works, BV17, BV18, BV21 and BV22 maintenance works

    Project Details

    • Client Name BP/BTC Co
    • Work Type Maintenance
    • Start October 2004
    • Completion March 2005
    • Location Georgia

    Tabatskuri-Balanta Road Rehabilitation

    Visual assessment of the road, development of road plans and road cover structure types.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
    Supervision of construction services, such as - profiling/leveling the existing ground road sections and arrangement of sand-gravel layer, road side ditches and steel water pipes at yard entrances and road crossings.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Construction
    • Start August 2004
    • Completion November 2004
    • Location Georgia

    Tbilsresi Power Units #3, 4 and 8 Rehabilitation Assessment

    Technical assessment of Tbilsresi Power Units #3,4 and 8 and determination of rehabilitation work scopes and costs.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study
    • Start October 2004
    • Completion November 2004
    • Location Georgia

    Bakuriani Roads Rehabilitation

    Design and survey of Bakuriani Central (3,7 km) and Bypass Roads (3,0 km), topographic survey of both roads, design of road long and cross sections, determination of road cover structure types, development of detail drawings necessary for rehabilitation of bridges and culverts, design of concrete ditches and definition of rehabilitation work scopes and costs.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
    Supervision of construction services, such as - rehabilitation of asphalt road (1,31 km long) and gravel road (1,1 km long) in Bakuriani, placement of reinforced concrete ditches and triangular concrete chutes on the asphalt roads and the repair of two bridge overpasses.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Detail design, Construction
    • Start August 2004
    • Completion October 2004
    • Location Georgia

    Bridge Testing in Akhaltsikhe Region

    Field test of the bridges over r. Mtkvari at village Atskuri and village Agara of Akhaltsikhe region. Loads Calculation. Recommendations Development.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Structural Study
    • Start July 2004
    • Completion August 2004
    • Location Georgia

    Water Supply Services for Bakuriani Region

    Design and construction works for water supply system of Bakuriani region, namely: geotechnical and survey works on route, determination of optimal route of the pipeline (3.5km), water supply system hydraulic report, including pipeline testing design; development of the design for headwork facility, water supply system construction, arrangement of headwork facility, one aerial crossing of river Tskhratskaro, one crossing of BTC pipeline route; installation of two reinforced concrete control wells and two reinforced concrete water supply regulation wells, testing of water supply system after construction, production of as-built documentation etc.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Detail design, Construction
    • Start July 2004
    • Completion August 2004
    • Location Georgia

    Structural Survey of Warehouse in Tbilisi, Tsereteli Ave.

    Obtain all the documentation concerning earthquake/tremors that have occurred in Tbilisi Georgia, and their frequency and magnitude over last 100yrs. Complete test digs of the foundations to access the quality, strength and floor weight loading per square meter, Complete test to determine the grade of bitumen used on the foundation surface and assess stability, determine the reinforcement precast elements of entire floor foundations.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Structural Study
    • Start July 2004
    • Completion August 2004
    • Location Georgia

    Tsalka Oil Spill Base Construction

    Monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
    Supervision of construction services, such as - construction of access road, site grading and leveling, construction of pre-designed concrete slab, construction of sewage disposal septic tank and water distribution system, installation of security fences and gates, arrangement of 250mm crushed gravel layer, installation of perimeter lighting, erection of pre-engineered steel building.

    Project Details

    • Client Name CMB Developments LTD
    • Work Type Construction
    • Start August 2004
    • Completion November 2004
    • Location Georgia

    Overhead Obstacles – Route Survey. Bridge Class Loads Determination

    Survey of overhead obstacles and bridge class loads determination for the following routes: Khashuri to Batumi state highway, Batumi to Poti state highway and Poti to Zestafoni to Chiatura to Gori state highway.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start July 2004
    • Completion August 2004
    • Location Georgia

    Survey Works and Geotechnical Works for Oil-Spill Bases in Borjomi

    Assess integrity of site retaining wall, carry out topographical survey, drill boreholes to determine geotechnical properties of the soil and carry out laboratory testing.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start June 2004
    • Completion July 2004
    • Location Georgia

    Dviri-Sakire Road Rehabilitation

    Visual assessment of the road, development of road plans and road cover structure types.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
    Supervision of construction services, such as - Profiling/leveling the existing ground road sections and arrangement of sand-gravel layer, road side ditches and steel water pipes at yard entrances and road crossings, pit-patching of the sections with asphalt concrete cover.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Feasibility Study, Construction
    • Start May 2004
    • Completion July 2004
    • Location Georgia

    Tsalka Internal Roads, Tetritskaro and Rustavi Districts Roads Sections, Kumisi Melioration Water Supply Preliminary Study

    Preliminary assessment of roads condition, rehabilitation work scope determination and preliminary cost estimation.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Preliminary Study
    • Start May 2004
    • Completion June 2004
    • Location Georgia

    Overhead Obstacles – Route Survey

    Survey of overhead obstacles for the following routes: Red bridge/ Azerbaijan border crossing to Tbilisi transit route, Tbilisi transit route and Tbilisi transit route to Rustavi receiving yard to PSG1, Rustavi receiving yard to Marneuli to Tetritskaro to PSG2, PSG2 to Tsalka via all-weather access track, Khashuri to Borjomi to Akhaltsikhe to Vale to Turkish border Crossing and Borjomi to Bakuriani to Tsikhisjvari.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Data Development
    • Start June 2004
    • Completion June 2004
    • Location Georgia

    Topographical Survey of Reed Bed Area near the Town Akhaltsikhe

    Topographical Survey of Reed Bed Area in 1:500 scales. Relevant drawings development

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey
    • Start May 2004
    • Completion May 2004
    • Location Georgia

    Road Maintenance Works in the Facilities Area of Influence

    Assisting with procurement of construction, supervision of construction services, project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
    Removal of damaged road base, paving geotextile membrane and arranging asphalt concrete upper layer starting from road cover base afterwards, arrangement of ditches, shoulders and road markings.

    Project Details

    • Client Name Spiecapag/Petrofac JV
    • Work Type Construction
    • Start April 2004
    • Completion November 2004
    • Location Georgia

    Sakire Survey/ Bed Stabilization Survey and Sediment Sampling/ Hydrological Data Provision

    Topographical survey in the Sakire area, stream cross-section, slope and sediment surveys and collection of hydrological data.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Data Development
    • Start April 2004
    • Completion April 2004
    • Location Georgia

    Preparation of the Design and Bidding Documents For the First Year Contracts. Secondary Road: Tbilisi-Ninotsminda Kps33-Kps53. Local Road: Partskisi-Manglisi Kps1-Kps23

    Design of road cover, development of bridges and water pipes rehabilitation project, Environmental Impact Assessment, processing construction organization, preparation of relevant documentation for construction.
    It has to be noted that there are three landslide hazard segments on Partskhisi-Manglisi segment, for which anti erosion structures – Gabion Retaining walls, Gabion Controls dams and Rip-Rap Channels were arranged

    Project Details

    • Client Name The State Department of Roads of Georgia/WB Transport Reform and Rehabilitation Center
    • Work Type Detail design
    • Start February 2004
    • Completion May 2004
    • Location Georgia

    Survey Works and Geotechnical Works for Oil-Spill Bases in Borjomi and Tsalka

    Spill bases sites survey works in Borjomi and Tsalka (scale 1:500), drilling geotechnical boreholes, laboratory analysis of soil samples, and preparation of relevant reports.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Report Development
    • Start February 2004
    • Completion May 2004
    • Location Georgia

    Marneuli-Jandara and Tetritskaro-Tsalka Motor Roads Rehabilitation Costs Preliminary Assessment

    Reconnaissance and design works. Reconnaissance works comprised of technical assessment of Marneuli-Jandara (61,4 km) and Tetritskaro-Tsalka (31,22 km) Roads and artificial structures located on these roads and Geotechnical visual inspection of the entire route.
    Design Works. Definition of rehabilitation work scopes on the basis of inspections and technical assessments of existing roads; development of road cover structures and rehabilitation work costs.

    Project Details

    • Client Name Spiecapag/Petrofac JV
    • Work Type Feasibility Study
    • Start November 2003
    • Completion December 2003
    • Location Georgia

    Engineering and Quantity Surveying Works for BTC Pipeline 9 River Crossings

    Determination of pipeline position on longitudinal sections, visual evaluation of soil, determination of cross-section configuration issuing relevant recommendations, determination of excavation work scopes.

    Project Details

    • Client Name Spiecapag/Petrofac JV
    • Work Type Feasibility Study
    • Start November 2003
    • Completion December 2003
    • Location Georgia

    Tsalka District Water Infrastructure Project

    Design and construction works for water supply of 6 villages of Tsalka district, namely: geotechnical and survey works on route, determination of optimal route of the pipeline (24km), water supply system hydraulic report, including pipeline testing design; Development of the rehabilitation design for headwork facilities, chlorine treatment facilities, existing two reservoirs, international and local supply with construction materials; design of two new capacity reservoirs construction, water supply system construction; two new 100kb/m reservoir, headwork facility and chlorine treatment facility, testing of water supply system after construction completion, production of as-built documentation etc.
    Assisting with procurement of construction, supervision of construction services, project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Detail design, Project Management
    • Start November 2003
    • Completion September 2004
    • Location Georgia

    Providing an Expert Service on “Effective Usage of Energy Resources by Communities an Improvement of Access to Energy Sources”

    Preparation of a summary detailing the existing technology on effective usage of the energy and alternative energy resources, development of charts of technology, providing suggestions on development of brochures and other demonstration materials.

    Project Details

    • Client Name Umid HSSC
    • Work Type Feasibility Study
    • Start October 2003
    • Completion December 2003
    • Location Georgia

    Call off to Provide Minor Works

    Dig trench of approximate 500m at designated location. Purchase and delivery 150mm diameter steel pipes in V. Sakuneti, Bakuriani District
    Constructing wooden and plank wall due to muffling noise from 22kw generator located in Tsalka town area.
    Manufacturing special equipment for pipeline out-of-roundness measurement.
    Delivery of portable water to Tsemi population by water tanker.
    Repair of water supply pipeline in Tsikhisjvari village, Bakuriani district.
    20cm thick sand-gravel mix was compacted along 3000m2 area was arranged at Rustavi PipeYard
    Outer and internal refurbishment works of Darakov village community hall in Tsalka district.
    Replacement of glasses in the schools in 2 villages of Tsalka region and restoration of some very damaged road segments

    Project Details

    • Client Name BP/BTC Co
    • Work Type Minor works provision
    • Start September 2003
    • Completion December 2003
    • Location Georgia

    Explosives Factory in Marneuli District – Environmental Impact Assessment

    Survey of ecological conditions of the area, environmental impact on topsoil, atmosphere and ground waters while factory construction – operation-takedown inclusive of potential risk assessments and mitigation measures development

    Project Details

    • Client Name Geo Nitro Ltd
    • Work Type EIA
    • Start September 2003
    • Completion November 2003
    • Location Georgia

    Provision of Stream Cross-Section and Topographic Survey “Scope-1”

    Topographic survey, cross-section survey, sediment sampling and grain size analysis, determination of maximum flow rates, processing of field data and preparation of deliverables for rivers Ktsia, Algeti and Gumbati and five stream crossings with BTC in Borjomi-Bakuriani region.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Data Development
    • Start August 2003
    • Completion September 2003
    • Location Georgia

    Provision of River Crossing Surveys

    Hydrological survey, river cross-section surveys and river sediment sampling of the six rivers in Akhaltsikhe area.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Data Development
    • Start August 2003
    • Completion September 2003
    • Location Georgia

    Provision of Stream Cross-Section and Topographic Survey “Scope-2”

    Topographic survey, cross-section survey, sediment sampling and grain size analysis, determination of maximum flow rates, processing of field data and preparation of deliverables for rivers Ktsia, Algeti and Gumbati and five stream crossings with BTC in Borjomi-Bakuriani region.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Field Survey, Data Development
    • Start June 2003
    • Completion July 2003
    • Location Georgia

    Access Roads Rehabilitation Design in Bakuriani Region for Baku-Tbilisi-Ceyhan (BTC) Pipeline Construction Project (60 km total length)

    Design of rehabilitation measures for Bakuriani-Tetritskaro Pass, Bakuriani-Tsikhisjvari, Dviri-Sakire and Borjomi-Bakuriani segments and geotechnical field works, visual geotechnical assessment during this period; development of road cover structures, road plans, long and cross-section profiles; re-design of small radius and narrow section of roads, bridge and pipe rehabilitation works, retaining walls in landslide area and galley places etc.

    Project Details

    • Client Name Spiecapag/Petrofac JV
    • Work Type Field Survey, Design
    • Start June 2003
    • Completion July 2003
    • Location Georgia

    Survey Works as Part of the Baku-Tbilisi-Ceyhan (BTC) Geohazards Investigation

    Line and point surveys using total station equipment at the Minadze, Tiseli, Sakire and Kodiana sites in Bakuriani District

    Project Details

    • Client Name URS D&M
    • Work Type Field Survey
    • Start May 2003
    • Completion June 2003
    • Location Georgia