    Provision of Plot Plans at PSG1 and PSG2 and Geodesic works

    Provision of topographic works in order to construct accommodation facilities in Gardabani PSG1 and Tetritskaro PSG2, determination of ground volumes needed to cut out(excavate) and scatter. Determination of layout of accommodation facilities and utilities needed to be directed towards them.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Design, Survey
    • Start ნოემბერი 2009
    • Completion იანვარი 2010
    • Location Georgia
    Published in Projects

    Temporary measures, for protection of Pipelines from washout, have been designed at the river Shamkirchai and permanent measures are in the stage of designing. Designing includes arrangement of concrete and riprap barrages, arrangement of river bed revetment structures by means of riprap.

    Additional Info

    • Client Name BP Exploration (Caspian Sea) Ltd. - Georgia
    • Work Type Detail design
    • Start ოქტომბერი 2009
    • Completion მარტი 2010
    • Location Azerbaijan
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:32

    Provision of Back-up Civil Services

    Conducted works comprise the following:
    - Arrangement of Wind Turbine Foundations and Cable Ducts at Block Valves 03 and 16 of BTC Pipeline.
    - Fence Repair Works at Block Valves 15 and 16 of BTC Pipeline.
    - Arrangement of Reinforced Concrete Trackways for Turbine Removal at PSG 1 and PSG 2.
    Works include detailed design as well as construction.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Detail design, Construction
    • Start სექტემბერი 2009
    • Completion იანვარი 2010
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:31

    Area 80 PA Construction

    Works consist of:
    - Earth works, ditch arrangement around the site, area fencing, internal road arrangement, concrete sidewalk arrangement, area landscaping.
    - Bedroom facility/connecting hallway and kitchen-dining facility construction (with total area 1020,8 sq.m.). These activities included construction of the foundation, foundation slab, columns, beams and ceiling slab with the r/c structures; also, arrangement of walls and partitions with various materials, their plastering and painting, winterization (warmth-keeping) of the foundation. Arrangement of steel trusses and purlins, roofing of buildings with galvalume-coated metal materials. Buildings were furnished with metal plastic windows, metal doors, iron-framed wooden doors, metal plastic doors and etc. Arrangement of indoor electrical system; outdoor security lighting, water supply, sewer system, heating, ventilation, security CCTV system, fire alarm system.
    - Generator and fuel storage shelter construction
    - Arrangement of chiller/freezer shelter
    - Arrangement of STP and its respective reed-bed.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start სექტემბერი 2009
    • Completion თებერვალი 2010
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:29

    Arrangement of magnets alongside the BTC and SCP Pipelines

    Works included arrangement of magnets at the top of the pipelines and their planning in absolute coordinates. In total 38 magnets have been arranged. Besides this, temporary monuments have been arranged alongside the pipelines.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Survey
    • Start აგვისტო 2009
    • Completion სექტემბერი 2009
    • Location Georgia
    Published in Projects
    ოთხშაბათი, 01 ნოემბერი 2017 17:26

    Arrangement of foundations for wind turbines and cable ducts at BV16 and GB03

    For installation of four wind turbines at BV16 and GB03 following works were done - topographical survey and geotechnical investigations of sites, calculation of bearing capacities of turbine foundations, rehabilitation of access roads, preparation of construction sites, installation of foundations of turbines and winch anchors with reinforced concrete, installation of cable ducts.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Design, Construction, Survey
    • Start ივლისი 2009
    • Completion ოქტომბერი 2009
    • Location Georgia
    Published in Projects