მოძებნე პროექტი

    ძებნის პარამეტრები

    • საძიებო სიტყვა
    • წელი
    • კლიენტი

    Provision of Back-up Civil Services

    Conducted works comprise the following:
    - Arrangement of Wind Turbine Foundations and Cable Ducts at Block Valves 03 and 16 of BTC Pipeline.
    - Fence Repair Works at Block Valves 15 and 16 of BTC Pipeline.
    - Arrangement of Reinforced Concrete Trackways for Turbine Removal at PSG 1 and PSG 2.
    Works include detailed design as well as construction.

    Additional Info

    • Client Name: BP/BTC Co
    • Work Type: Detail design, Construction
    • Start: სექტემბერი 2009
    • Completion: იანვარი 2010
    • Location: Georgia
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    ძებნა