Assess integrity of site retaining wall, carry out topographical survey, drill boreholes to determine geotechnical properties of the soil and carry out laboratory testing.
Visual assessment of the road, development of road plans and road cover structure types.
Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
Supervision of construction services, such as - Profiling/leveling the existing ground road sections and arrangement of sand-gravel layer, road side ditches and steel water pipes at yard entrances and road crossings, pit-patching of the sections with asphalt concrete cover.
Preliminary assessment of roads condition, rehabilitation work scope determination and preliminary cost estimation.
Survey of overhead obstacles for the following routes: Red bridge/ Azerbaijan border crossing to Tbilisi transit route, Tbilisi transit route and Tbilisi transit route to Rustavi receiving yard to PSG1, Rustavi receiving yard to Marneuli to Tetritskaro to PSG2, PSG2 to Tsalka via all-weather access track, Khashuri to Borjomi to Akhaltsikhe to Vale to Turkish border Crossing and Borjomi to Bakuriani to Tsikhisjvari.
Topographical Survey of Reed Bed Area in 1:500 scales. Relevant drawings development
Assisting with procurement of construction, supervision of construction services, project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.
Removal of damaged road base, paving geotextile membrane and arranging asphalt concrete upper layer starting from road cover base afterwards, arrangement of ditches, shoulders and road markings.
Topographical survey in the Sakire area, stream cross-section, slope and sediment surveys and collection of hydrological data.
Design of road cover, development of bridges and water pipes rehabilitation project, Environmental Impact Assessment, processing construction organization, preparation of relevant documentation for construction.
It has to be noted that there are three landslide hazard segments on Partskhisi-Manglisi segment, for which anti erosion structures – Gabion Retaining walls, Gabion Controls dams and Rip-Rap Channels were arranged
Spill bases sites survey works in Borjomi and Tsalka (scale 1:500), drilling geotechnical boreholes, laboratory analysis of soil samples, and preparation of relevant reports.
Design and construction works for water supply of 6 villages of Tsalka district, namely: geotechnical and survey works on route, determination of optimal route of the pipeline (24km), water supply system hydraulic report, including pipeline testing design; Development of the rehabilitation design for headwork facilities, chlorine treatment facilities, existing two reservoirs, international and local supply with construction materials; design of two new capacity reservoirs construction, water supply system construction; two new 100kb/m reservoir, headwork facility and chlorine treatment facility, testing of water supply system after construction completion, production of as-built documentation etc.
Assisting with procurement of construction, supervision of construction services, project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, and HSE assurance.