LLC Oceaneering is carrying out replacement of SPM at Baku-Supsa Oil Pipeline. IDC scope is to assemble hoses for New SPM and dissemble hoses of old SPM. IDC provides various equipment (cranes, forklifts, motorboats, generators, lighting towers, containers etc.) for the Client. Also, IDC is providing various category personnel, such as Project Coordinator, Project manager, Site Supervisor, Hose assembly Supervisor, Hose Assembly Technician, HSE Officers, Lifting Supervisors, Riggers / Slingers etc. IDC scope includes onshore works of SPM replacement. The works are performed at Poti Port in Georgia.
Car parking Arrangement for the US Embassy.
Civil works - temporary works, site clearance, site set-up, transportation (including handling and lifting) of materials and equipment, in-situ concrete, pre-cast concrete, piling, excavations, shoring, fencing, man-holes, pits/covered tanks, sewer and water main renovation and ancillary works, pipelines and pipework (on ground, in trenches), roads and pavings, earthworks, ground investigation, building works, reinstatement, river crossings works, drainage works, dewatering, cable ducting (below ground), procurement, supply and delivery of materials and consumables, painting , waterproofing, inspection and testing, removal of excess and waste materials from the worksite upon completion of the work., preparation of as-built and materials traceability drawings, weld record/NDE drawings and the compilation and presentation of certification packages.
Structural works - structural fabrication, pre-fabrication, transportation (including handling and lifting) of pre-fabricated assemblies, materials and equipment, structural construction, procurement, supply and delivery of consumables, inspection and testing, removal of excess and waste materials from the worksite upon completion of the work, preparation of as-built and materials traceability drawings, weld record/NDE drawings and the compilation and presentation of certification packages.
The Project is on Call-off basis.