Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance, procurement. Carry out construction works such as – Excavation of damaged road structures, arrangement of road base with sand-crushed stone material, supply and installation of asphalt road surface.
Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance, procurement. Carry out construction works such as – Excavation of damaged road section for installation flume pipes, Installation of flume pipes, arrangement concrete headwalls, arrangement protection walls with gabions, installation of reno-mattresses in the river bed, widening the river bed, arrangement road surface with rip-rap.
Earth works, ESP manifold and water injection manifolds support manufacturing and installation. Construction of reinforced concrete sump pit. Installation of road crossings (buried casing pipe). Installation of piping, valves and instrumentations (welding, flanged connections). Construction of HP pump manifold. UV test of LP and HB welded joints. Hydrotest of installed piping. Welding works for reconstruction of oil steel tanks. Reconstruction of various type vessels – cutting off old flanges and pipes and installation of new ones with welding. Tanks external surface blasting and painting. Thickness test and NDI. Hydrotest of tanks. Reconstruction and extension of steel shelter for pump. Arrangement of drainage around underground concrete pits, arrangement of underground drainage systems.
Processing route options and selection of final route; provision of topographical, geotechnical and hydrological surveys; elaboration of pipeline plan and profile, plan of crossings, typical drawings, work scopes, MTO, calendar schedule and organization chart of construction works. Obtainment of construction permit. Length of gas pipeline is 19.6 km.
Civil works - temporary works, site clearance, site set-up, transportation (including handling and lifting) of materials and equipment, in-situ concrete, pre-cast concrete, piling, excavations, shoring, fencing, man-holes, pits/covered tanks, sewer and water main renovation and ancillary works, pipelines and pipework (on ground, in trenches), roads and pavings, earthworks, ground investigation, building works, reinstatement, river crossings works, drainage works, dewatering, cable ducting (below ground), procurement, supply and delivery of materials and consumables, painting , waterproofing, inspection and testing, removal of excess and waste materials from the worksite upon completion of the work., preparation of as-built and materials traceability drawings, weld record/NDE drawings and the compilation and presentation of certification packages.
Structural works - structural fabrication, pre-fabrication, transportation (including handling and lifting) of pre-fabricated assemblies, materials and equipment, structural construction, procurement, supply and delivery of consumables, inspection and testing, removal of excess and waste materials from the worksite upon completion of the work, preparation of as-built and materials traceability drawings, weld record/NDE drawings and the compilation and presentation of certification packages.
The Project is on Call-off basis.