Execution of design works for Supsa Camp of Baku-Supsa oil pipeline. Basing on the design, the existing pipework was replaced at external area and inside of Supsa Camp. The work included replacement of hot water, cold water and heating pipelines. In total, 630 m internal network pipes and 940 m external network pipes were replaced. Also, existing diesel-powered tank was replaced with new electrical water heater, equipped with softener and pumps.
Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance, procurement. Carry out construction works such as - excavation of damaged asphalt concrete, constructing of road base with sand-crushed stone material, arrangement layers of pavement from coarse and fine grained asphalt concrete mix.
Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance, procurement. Carry out construction works, such as - cold milling of damaged asphalt concrete, repair of potholes in the existing asphalt concrete, constructing of road base with sand-crushed stone material, arrangement layers of pavement from coarse and fine grained hot asphalt concrete mix, constructing the shoulders from sand-crushed stone material, road marking.
4 boreholes with a total length of 32 m were drilled within an area of 10880 sq. m., 4 CBR tests were conducted, laboratory tests of physical-mechanical and chemical properties of the soil samples taken from the boreholes were conducted.
Detailed survey of pipeline route (63 km), existing benchmarks checking, new primary control points establishment, staking of pipeline route axis, survey of railway, roads, underground and above ground communications crossings, survey of plants at MX40/41, MX77, MX81, delivery of maps, drawings, reports.
Detail Design for all disciplines required for the Services including, but not limited to: mechanical, structural, piping, stress, process, corrosion, welding, instrumentation, electrical, safety/fire, automation, telecommunications, materials, package/vendor, civil including erosion control, landslide mitigation and river crossings enhancement works engineering. The Project is on Call-off basis.
Erosion control and reinstatement works at River Crossings, which includes but not limited to river bank and bed reinforcement works with Riprap, Maccaferri gabions, concrete structures and etc; Reinstatement and recovery of the preconstruction vegetation and etc. The Project is on Call-off basis.
Provide Company with construction, civil engineering, design, surveying and general Project services as per detailed Scope of Work described in Call-Off’s, which shall be issued by Company time by time. The works performed / to be performed at any site/s required by Company inclusive of, but not limited to, pipeline river and canal crossings, access roads, pipeline over-ground installations etc.
The services are performed along BTC and WREP Oil Pipelines, SCP Gas Pipeline and at BP’s facilities, including pump stations, pressure reduction stations, PSG1, PSG2, pipelines right of way, valve stations, river crossings, Supsa terminal, storage yards etc.
The services include - road repair, gravel work, equipment repair, response to land slips and other erosion-related emergencies, remedial works, manual handling, small civil constriction works, mechanical works, provision of laborers, provide and maintain winter access to a set number of block and check valves, provision of materials, equipment, plant and machinery, transportation services for heavy and light loads. The Project is on Call-off basis.