Project planning and scheduling, procurement of materials, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance, carry out of construction/renovation activities, such as modification of existing ventilation system network, removal of existing flooring and arrangement of new one using ceramic tiles, installation of sewerage and water supply networks, wall painting, installation of wooden and steel doors, installation of Armstrong ceiling.
Topographical Survey of the existing road with a length of approximately 4,5 km and a width of 9,5m (inclusive 1,5m shoulders on each side). Installation of 9 permanent benchmarks, within this defined corridor survey all surface and overhead features and CAT scan to determine the locations of underground facilities. Develop road design drawings providing the horizontal alignment, cross – sections and profile. Adopt the existing road vertical and horizontal alignments wherever possible. Provision BOQ for construction/rehabilitation works, report development.
Project planning and scheduling, procurement of materials, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance, carry out of construction activities, such as stripping and stockpiling the topsoil, construction of levelling layer and road structure using sand/gravel and crushed rock, installation of 500 mm diameter culverts using corrugated plastic pipes, arrangement of ditches, installation of concrete slabs at the pipeline crossings. Road length is 2 050 m.
Detailed survey of pipeline route (63 km), existing benchmarks checking, new primary control points establishment, staking of pipeline route axis, survey of railway, roads, underground and above ground communications crossings, survey of plants at MX40/41, MX77, MX81, delivery of maps, drawings, reports.
Detail Design for all disciplines required for the Services including, but not limited to: mechanical, structural, piping, stress, process, corrosion, welding, instrumentation, electrical, safety/fire, automation, telecommunications, materials, package/vendor, civil including erosion control, landslide mitigation and river crossings enhancement works engineering. The Project is on Call-off basis.
Erosion control and reinstatement works at River Crossings, which includes but not limited to river bank and bed reinforcement works with Riprap, Maccaferri gabions, concrete structures and etc; Reinstatement and recovery of the preconstruction vegetation and etc. The Project is on Call-off basis.
Provide Company with construction, civil engineering, design, surveying and general Project services as per detailed Scope of Work described in Call-Off’s, which shall be issued by Company time by time. The works performed / to be performed at any site/s required by Company inclusive of, but not limited to, pipeline river and canal crossings, access roads, pipeline over-ground installations etc.
Call-Out manpower and equipment supply for South Caucasus Pipeline Expansion Project (“SCPX’) early works and facilities worksites.
The services are performed along BTC and WREP Oil Pipelines, SCP Gas Pipeline and at BP’s facilities, including pump stations, pressure reduction stations, PSG1, PSG2, pipelines right of way, valve stations, river crossings, Supsa terminal, storage yards etc.
The services include - road repair, gravel work, equipment repair, response to land slips and other erosion-related emergencies, remedial works, manual handling, small civil constriction works, mechanical works, provision of laborers, provide and maintain winter access to a set number of block and check valves, provision of materials, equipment, plant and machinery, transportation services for heavy and light loads. The Project is on Call-off basis.