    Wednesday, 01 November 2017 17:31

    Area 80 PA Construction

    Works consist of:
    - Earth works, ditch arrangement around the site, area fencing, internal road arrangement, concrete sidewalk arrangement, area landscaping.
    - Bedroom facility/connecting hallway and kitchen-dining facility construction (with total area 1020,8 sq.m.). These activities included construction of the foundation, foundation slab, columns, beams and ceiling slab with the r/c structures; also, arrangement of walls and partitions with various materials, their plastering and painting, winterization (warmth-keeping) of the foundation. Arrangement of steel trusses and purlins, roofing of buildings with galvalume-coated metal materials. Buildings were furnished with metal plastic windows, metal doors, iron-framed wooden doors, metal plastic doors and etc. Arrangement of indoor electrical system; outdoor security lighting, water supply, sewer system, heating, ventilation, security CCTV system, fire alarm system.
    - Generator and fuel storage shelter construction
    - Arrangement of chiller/freezer shelter
    - Arrangement of STP and its respective reed-bed.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Construction
    • Start September 2009
    • Completion February 2010
    • Location Georgia
    Published in Projects

    Works included arrangement of magnets at the top of the pipelines and their planning in absolute coordinates. In total 38 magnets have been arranged. Besides this, temporary monuments have been arranged alongside the pipelines.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Survey
    • Start August 2009
    • Completion September 2009
    • Location Georgia
    Published in Projects

    For installation of four wind turbines at BV16 and GB03 following works were done - topographical survey and geotechnical investigations of sites, calculation of bearing capacities of turbine foundations, rehabilitation of access roads, preparation of construction sites, installation of foundations of turbines and winch anchors with reinforced concrete, installation of cable ducts.

    Project Details

    • Client Name BP/BTC Co
    • Work Type Design, Construction, Survey
    • Start July 2009
    • Completion October 2009
    • Location Georgia
    Published in Projects