Scope of services includes monitoring topographic survey of SM and DM existing on the landslide sections and faulty zones alongside the AGT Pipelines in Georgia (in Krassovsky 1940 absolute coordinate system). Topographic works are carried out with Total Stations after which new data or Monuments are compared to that of old ones. In total baseline survey of 204 existing monuments should be carried out.
Scope of services includes monitoring topographic survey of new SM and DM on the landslide sections and faulty zones alongside the AGT & WREP Pipelines in Georgia (in Krassovsky 1940 absolute coordinate system). Topographic works are carried out with Total Stations & GPS after which new data or Monuments are compared to that of old ones. In total baseline survey of 204 existing monuments should be carried out.
A scope of services includes, but it is not limited to the supply of personnel to perform investigations, discipline and design services supporting projects as directed by COMPANY. Engineering technical discipline include topography, geotechnical, structural, civil, architectural, HVAC, mechanical, electrical.
Geotechnical and topographic survey, vertical planning. Design of: drainage for rainwater runoff, hot and cold water distribution system, architectural design including finishes, layout, windows, doors, etc, structural design, concrete roads and pavements per BTC standards.
Drilling of boreholes, 60 l.m., geotechnical reconnaissance of research area, topographical survey of approximately 60-hectare area (scale 1:1000), production of report.
Drilling one borehole (with depth of 5-10 m) at each site of tower installation; taking soil and water samples from the boreholes and performance of their laboratory analysis; preparation of geotechnical report (geotechnical investigations for installation areas of 56 towers has been performed up to date); inspection of tower foundation design provided by the client and performance of expert examination; supervision of arrangement of tower foundation and tower installation works during construction activities; laboratory testing of concrete test cubes, inspection of tower verticality, inspection of certification of the materials
Supervision for upgrading Km 0 - -Km 27 and Km 27 – Km 54 section of Vaziani-Gombori-Telavi Road.
IDC Ltd acted as a “Local Associate” of MMM Group limited (“Lead Consultant”). Works were conducted in accordance of FIDIC guidelines and included supervision of: road rehabilitation, arrangement of bridges, gabions, retaining walls, water drainage and reinforced concrete channels.
Topographical and geotechnical surveys were performed. Reinforced concrete foundations for STP units (RBC Unit, Twin Effluent Pump Station, UV Chamber and Mag Flow meter), concrete surroundings and pipelines from STP facilities to r. Supsa were designed in accordance with provided dimensions. Layout schemes for STP facilities were determined.
Provision of topographic works in order to construct accommodation facilities in Gardabani PSG1 and Tetritskaro PSG2, determination of ground volumes needed to cut out(excavate) and scatter. Determination of layout of accommodation facilities and utilities needed to be directed towards them.
Temporary measures, for protection of Pipelines from washout, have been designed at the river Shamkirchai and permanent measures are in the stage of designing. Designing includes arrangement of concrete and riprap barrages, arrangement of river bed revetment structures by means of riprap.
Conducted works comprise the following:
- Arrangement of Wind Turbine Foundations and Cable Ducts at Block Valves 03 and 16 of BTC Pipeline.
- Fence Repair Works at Block Valves 15 and 16 of BTC Pipeline.
- Arrangement of Reinforced Concrete Trackways for Turbine Removal at PSG 1 and PSG 2.
Works include detailed design as well as construction.