Reconstruction of t. Gurjaani wine factory administrative building to hotel facility. The work includes: architectural design, structural calculations of bearing elements, design of water supply, sewerage, and heating-ventilation and power supply networks, interior design. Also, tennis courts, sauna and other recreation facilities within the hotel complex.
Design of underground passage on V. Gorgasali square, the passage comprises of r/c gallery, dome cladding and entrance/exit.
The detail design includes structural design of the passage based on the architecture in view of underground utility locations.
The bearing elements of the passage were calculated per the shallow-depth tunnel scheme. The formwork and reinforcing drawings, water supply system for fire hydrants were developed and excavation strengthening structure was distinguished.
Management of construction services, such as - cleaning/reinstating existing concrete ditches and pipes, leveling road bed, reinstating the damaged asphalt cover, removing deformed sub layer and damaged and cracked asphalt, arranging of asphalt layer, repairing concrete ditches and culverts, arranging new culverts, marking the cover etc on eight asphalt roads with approximate total length 27km in Gardabani, Marneuli and Tetritskaro Districts.
The services are performed along BTC and WREP Oil Pipelines, SCP Gas Pipeline and at BP’s facilities, including pump stations, pressure reduction stations, PSG1, PSG2, pipelines right of way, valve stations, river crossings, Supsa terminal, storage yards etc.
The services include - road repair, gravel work, equipment repair, response to land slips and other erosion-related emergencies, remedial works, manual handling, small civil constriction works provision of laborers, provide and maintain winter access to a set number of block and check valves, provision of materials, equipment, plant and machinery, transportation services for heavy and light loads
Sluice gate fabrication, sluice gate R/C precast structure fabrication, trench excavation, earth dam arrangement, covering water diverter with riprap, arranging key wall with riprap
In total up to 30 m boreholes drilling at PSG1 for OSRB, core sampling, topographic survey works fulfilment, ground samples, laboratory testing, field and lab geotechnical data processing, field topographic data processing, relative recommendation development, report development.
Lift shaft strengthening and hydraulic lift installation, which comprises if two main elements: 16m high lift shaft strengthening with prefabricated steel elements, reinforced concrete plain roof arrangement on the lift shaft, lift rails and lift installation.
Drainage system and Reinforced Concrete Slab Arrangement: demolish existing 500sq.m. R/C slab in the BTC OPS yard, 20 cm thickness crushed rock layer arrangement and compaction, 20 cm thickness in city cast R/C slab arrangement, waterproof sealant application between the R/C slab sections.
Topographic survey at rail crossing 1n1:500 scale both railroad and vehicle road sections inclusive. Vehicle roads CBR testing. Design of Railroad crossing features and vehicle road cover design. Report Development.
Assessment of buildings bearing structures, determination of existing damages (if any). Recommendations issue about antennas installation on the buildings taking into account their structural integrity.
Recovering works and maintenance at BV12; Refuelling at GB 21; Rock salt delivery from Rustavi pipe yard to PSG: Fabrication of fuel container and its transportation to Rustavi pipe yard; Provision of Water Tanker for PSG 1.