Field test of the bridges over r. Mtkvari at village Atskuri and village Agara of Akhaltsikhe region. Loads Calculation. Recommendations Development.
Design and construction works for water supply system of Bakuriani region, namely: geotechnical and survey works on route, determination of optimal route of the pipeline (3.5km), water supply system hydraulic report, including pipeline testing design; development of the design for headwork facility, water supply system construction, arrangement of headwork facility, one aerial crossing of river Tskhratskaro, one crossing of BTC pipeline route; installation of two reinforced concrete control wells and two reinforced concrete water supply regulation wells, testing of water supply system after construction, production of as-built documentation etc.
Obtain all the documentation concerning earthquake/tremors that have occurred in Tbilisi Georgia, and their frequency and magnitude over last 100yrs. Complete test digs of the foundations to access the quality, strength and floor weight loading per square meter, Complete test to determine the grade of bitumen used on the foundation surface and assess stability, determine the reinforcement precast elements of entire floor foundations.
Monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
Supervision of construction services, such as - construction of access road, site grading and leveling, construction of pre-designed concrete slab, construction of sewage disposal septic tank and water distribution system, installation of security fences and gates, arrangement of 250mm crushed gravel layer, installation of perimeter lighting, erection of pre-engineered steel building.
Survey of overhead obstacles and bridge class loads determination for the following routes: Khashuri to Batumi state highway, Batumi to Poti state highway and Poti to Zestafoni to Chiatura to Gori state highway.
Assess integrity of site retaining wall, carry out topographical survey, drill boreholes to determine geotechnical properties of the soil and carry out laboratory testing.
Visual assessment of the road, development of road plans and road cover structure types.
Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
Supervision of construction services, such as - Profiling/leveling the existing ground road sections and arrangement of sand-gravel layer, road side ditches and steel water pipes at yard entrances and road crossings, pit-patching of the sections with asphalt concrete cover.
Preliminary assessment of roads condition, rehabilitation work scope determination and preliminary cost estimation.
Survey of overhead obstacles for the following routes: Red bridge/ Azerbaijan border crossing to Tbilisi transit route, Tbilisi transit route and Tbilisi transit route to Rustavi receiving yard to PSG1, Rustavi receiving yard to Marneuli to Tetritskaro to PSG2, PSG2 to Tsalka via all-weather access track, Khashuri to Borjomi to Akhaltsikhe to Vale to Turkish border Crossing and Borjomi to Bakuriani to Tsikhisjvari.
Topographical Survey of Reed Bed Area in 1:500 scales. Relevant drawings development