Find Project

    Filter by:

    • Search
    • Year
    • Client Name

    Temporary Bank Revetment Design on Kura West in Azerbaijan

    Based of geotechnical and hydrological investigation and topographic survey data, temporary bank revetment is designed to protect the WREP pipeline on this section of the ROW.

    Project Details

    • Client Name: BP/BTC Co
    • Work Type: Design
    • Start: September 2006
    • Completion: November 2006
    • Location: Azerbaijan
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    Search