Find Project

    Filter by:

    • Search
    • Year
    • Client Name

    Water Pipeline construction in V. Andeziti (1,6km Length)

    Design and construction works for water supply system of Bakuriani region, v. Andeziti, namely: geotechnical and survey works on route, determination of optimal route of the pipeline (1,2km length)), water supply system hydraulic report, including pipeline testing design; development of the design for headwork facility. Water supply system construction from 150mm diameter steel and plastic pipes, arrangement of reinforced concrete headwork facility.

    Project Details

    • Client Name: BP/BTC Co
    • Work Type: Detail design, Construction
    • Start: August 2006
    • Completion: November 2006
    • Location: Georgia
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    Search