Find Project

    Filter by:

    • Search
    • Year
    • Client Name

    GB21 Access Road Detailed Design

    Detail design of 2.2km long access road to GB21. For narrowing the gradients and selecting best road cover, three options were developed. Among the developed options, option II was considered most feasible, in case of which maximum gradient did not exceed 22%, which ensured more safe movement compared to option I and III.

    Project Details

    • Client Name: BP/BTC Co
    • Work Type: Design, Survey
    • Start: June 2006
    • Completion: July 2006
    • Location: Georgia
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    Search