Security hut, perimeter wall, heated and lean-to area, first floor Strengthening, lift shaft strengthening, yard drainage system, main entrance door design.
Main entrance door and rigidity frame assembling design.
Security hut, perimeter wall, heated and lean-to area, first floor Strengthening, lift shaft strengthening, yard drainage system, main entrance door design.
Main entrance door and rigidity frame assembling design.