In order to condition Iagluja landfill area camp design is being developed covering dwelling modules, catering place, lockers and fuel storage area. Drainage, power supply and potable water networks are being deigned as well.
Besides, about 1200m long water diversion system of reinforced/concrete chutes and steel pipes is being designed. The system objective is to avoid filtration of the water flown down the slopes in the landfill.