    Detailed Scope of Work and Cost Estimation for BTC Ops Warehouse Repairing Works

    Prepare plans of the existing facility. Determination of floor loading per square meter on the first floor of warehouse
    Calculation the warehouse for 8 point seismic load in case the walls on the ground and first floors are demolished.
    Determination of repair works scopes including concrete, carpentry, plastering, electrical and etc works.

    Project Details

    • Client Name: BP/BTC Co
    • Work Type: Structural Study, Repair Works Scopes development
    • Start: June 2005
    • Completion: August 2005
    • Location: Georgia