    Bakuriani Central Road (1.29km length) and Bypass Road (3km length) Rehabilitation

    Rehabilitation measures revision.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
    Supervision of construction services, such as - cleaning/reinstating existing concrete ditches, arranging r/c roadside ditches, reinstating the damaged asphalt cover, removing deformed cover and foundation, arranging of asphalt layer, replacement of bridge cover and water culvert pipes, arranging road shoulders etc.

    Project Details

    • Client Name: BP/BTC Co
    • Work Type: Feasibility Study, Construction
    • Start: February 2005
    • Completion: August 2005
    • Location: Georgia