Find Project

    Filter by:

    • Search
    • Year
    • Client Name

    Lemshveniera Road Rehabilitation

    Assessment of the road, development of road plans and road cover structure types.
    Project planning and scheduling, monitoring and reporting of physical and financial progress, quality assurance, HSE assurance.
    Supervision of construction services, such as - cleaning/reinstating existing concrete ditches, earth and gravelling works, arranging water culvert pipes, reinstating the damaged asphalt cover, removing damaged and cracked asphalt, arranging of asphalt lower and upper layers, using geotextile Terram 1500 to strengthen road foundation at some specific sections, arranging road shoulders and parapets.

    Project Details

    • Client Name: BP/BTC Co
    • Work Type: Feasibility Study, Construction
    • Start: February 2005
    • Completion: July 2005
    • Location: Georgia
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    Search