The works included civil works (arrangement of new walls and partitions, tiling works in bathrooms, raised floor and carpets installation, suspended sealings installation, plastering, painting), installation of heating, ventilation, air conditioning, water supply system, sewage and fancoil condensation piping systems, fire alarm, fire detection and firefighting systems, electricity, low currents. The listed works were executed by a third party.
IDC was carrying out quality control of materials and executed works, control of compliance with design, project schedule and project financial part.