    Area 80 PA Construction

    Works consist of:
    - Earth works, ditch arrangement around the site, area fencing, internal road arrangement, concrete sidewalk arrangement, area landscaping.
    - Bedroom facility/connecting hallway and kitchen-dining facility construction (with total area 1020,8 sq.m.). These activities included construction of the foundation, foundation slab, columns, beams and ceiling slab with the r/c structures; also, arrangement of walls and partitions with various materials, their plastering and painting, winterization (warmth-keeping) of the foundation. Arrangement of steel trusses and purlins, roofing of buildings with galvalume-coated metal materials. Buildings were furnished with metal plastic windows, metal doors, iron-framed wooden doors, metal plastic doors and etc. Arrangement of indoor electrical system; outdoor security lighting, water supply, sewer system, heating, ventilation, security CCTV system, fire alarm system.
    - Generator and fuel storage shelter construction
    - Arrangement of chiller/freezer shelter
    - Arrangement of STP and its respective reed-bed.

    Project Details

    • Client Name: BP/BTC Co
    • Work Type: Construction
    • Start: September 2009
    • Completion: February 2010
    • Location: Georgia