Area 80 PA Construction

Construction

Area 80 PA Construction

Client
BP/BTC Co
Work Type
Construction
Location
Georgia
Project Status
Completed
Start Date
2009-09-27
End Date
2011-02-27

Area 80 PA Construction

Works consist of:- Earth works, ditch arrangement around the site, area fencing, internal road arrangement, concrete sidewalk arrangement, area landscaping.- Bedroom facility/connecting hallway and kitchen-dining facility construction (with total area 1020,8 sq.m.). These activities included construction of the foundation, foundation slab, columns, beams and ceiling slab with the r/c structures; also, arrangement of walls and partitions with various materials, their plastering and painting, winterization (warmth-keeping) of the foundation. Arrangement of steel trusses and purlins, roofing of buildings with galvalume-coated metal materials. Buildings were furnished with metal plastic windows, metal doors, iron-framed wooden doors, metal plastic doors and etc. Arrangement of indoor electrical system; outdoor security lighting, water supply, sewer system, heating, ventilation, security CCTV system, fire alarm system.- Generator and fuel storage shelter construction- Arrangement of chiller/freezer shelter- Arrangement of STP and its respective reed-bed.

Looking to Execute a Similar Project?

Partner with IDC to bring your next infrastructure, energy, or industrial project to life. With decades of proven experience and a commitment to quality, safety, and precision, we're ready to help you achieve outstanding results.

Get in touch

Similar projects

Investigation | Design | Construction | Supervision