Designing and construction of STP facilities in Tetritskaro (PSG2) and Tsalka (OSRB).

Survey, Detail Design, Construction

Designing and construction of STP facilities in Tetritskaro (PSG2) and Tsalka (OSRB).

Client
BP/BTC Co
Work Type
Survey, Detail Design, Construction
Location
Georgia
Project Status
Completed
Start Date
2009-03-27
End Date
2009-12-27

Designing and construction of STP facilities in Tetritskaro (PSG2) and Tsalka (OSRB).

Topographical and geotechnical surveys have been conducted; there have been designed reinforced concrete foundations for STP facilities and concrete surroundings, reinforced concrete intake and discharge manholes in the reed-bed according to the given dimensions, also pipelines from STP facilities to the reed-bed and from the reed-bed to the existing ravine. Layout schemes for STP facilities have been determined. Construction process included installation of necessary STP equipment (RBC Unit, Twin Effluent Pump Station, UV Chamber and Mag Flow meter) on the pre-arranged reinforced concrete foundation and placement of these equipment in the concrete slabs. Also, construction of reed-bed.

Looking to Execute a Similar Project?

Partner with IDC to bring your next infrastructure, energy, or industrial project to life. With decades of proven experience and a commitment to quality, safety, and precision, we're ready to help you achieve outstanding results.

Get in touch
Investigation | Design | Construction | Supervision