Water Pipeline construction in V. Andeziti (1,6km Length)

Client
BTC Co
Work Type
Detail Design / Construction
Location
Georgia
Project Status
Completed
Start Date
2006-08-27
End Date
2006-11-27
Water Pipeline construction in V. Andeziti (1,6km Length)
Design and construction works for water supply system of Bakuriani region, v. Andeziti, namely: geotechnical and survey works on route, determination of optimal route of the pipeline (1,2km length)), water supply system hydraulic report, including pipeline testing design; development of the design for headwork facility. Water supply system construction from 150mm diameter steel and plastic pipes, arrangement of reinforced concrete headwork facility.