Facility and Drainage Design

Design

Facility and Drainage Design

Client
BP/BTC Co
Work Type
Design
Location
Georgia
Project Status
Completed
Start Date
2006-03-27
End Date
2006-06-27

Facility and Drainage Design

In order to condition Iagluja landfill area camp design is being developed covering dwelling modules, catering place, lockers and fuel storage area. Drainage, power supply and potable water networks are being deigned as well.Besides, about 1200m long water diversion system of reinforced/concrete chutes and steel pipes is being designed. The system objective is to avoid filtration of the water flown down the slopes in the landfill.

Looking to Execute a Similar Project?

Partner with IDC to bring your next infrastructure, energy, or industrial project to life. With decades of proven experience and a commitment to quality, safety, and precision, we're ready to help you achieve outstanding results.

Get in touch
Investigation | Design | Construction | Supervision