Supsa Camp Water Pipework Replacement

Design / Construction

Supsa Camp Water Pipework Replacement

Client
BP Exploration
Work Type
Design / Construction
Location
Georgia
Project Status
completed
Start Date
2017-11-27
End Date
2018-02-27

Supsa Camp Water Pipework Replacement

Execution of design works for Supsa Camp of Baku-Supsa oil pipeline. Basing on the design, the existing pipework was replaced at external area and inside of Supsa Camp. The work included replacement of hot water, cold water and heating pipelines. In total, 630 m internal network pipes and 940 m external network pipes were replaced. Also, existing diesel-powered tank was replaced with new electrical water heater, equipped with softener and pumps.

Looking to Execute a Similar Project?

Partner with IDC to bring your next infrastructure, energy, or industrial project to life. With decades of proven experience and a commitment to quality, safety, and precision, we’re ready to help you achieve outstanding results.

Get in touch

Similar projects

Investigation | Design | Construction | Supervision