Supsa Camp Water Pipework Replacement

Client
BP Exploration
Work Type
Design / Construction
Location
Georgia
Project Status
completed
Start Date
2017-11-27
End Date
2018-02-27
Supsa Camp Water Pipework Replacement
Execution of design works for Supsa Camp of Baku-Supsa oil pipeline. Basing on the design, the existing pipework was replaced at external area and inside of Supsa Camp. The work included replacement of hot water, cold water and heating pipelines. In total, 630 m internal network pipes and 940 m external network pipes were replaced. Also, existing diesel-powered tank was replaced with new electrical water heater, equipped with softener and pumps.