WREP Rustavi Fault Crossing Engineering Measures Development (KP479)

Field Survey / Detail Design

WREP Rustavi Fault Crossing Engineering Measures Development (KP479)

Client
Georgian Pipeline Company
Work Type
Field Survey / Detail Design
Location
Georgia
Project Status
Completed
Start Date
2003-03-27
End Date
2003-03-27

WREP Rustavi Fault Crossing Engineering Measures Development (KP479)

Design works in order to improve pipeline operable conditions at KP479,7 from Baku tectonic fault crossing of Georgian Section of WREP.Design works: F5,3 ha field topographic survey, geotechnical and laboratory works, pipeline burial depth determination, desktop processing, development of the design to provide re-grading of soil cover on the 200m section of the pipeline also to enable effective drainage of rainwater by rip-rap channels; determination of relevant ground works scopes; reduce soil cover to 0.9m over the pipeline in order to improve pipe working under seismic loads

Looking to Execute a Similar Project?

Partner with IDC to bring your next infrastructure, energy, or industrial project to life. With decades of proven experience and a commitment to quality, safety, and precision, we're ready to help you achieve outstanding results.

Get in touch
Investigation | Design | Construction | Supervision