Georgian Gas Transmission Pipeline Rehabilitation TC – Technical and Environmental Survey

Georgian Gas Transmission Pipeline Rehabilitation TC – Technical and Environmental Survey
Detailed technical specific surveys on the various sections of the Georgian Gas Transmission Pipeline which includes: geotechnical Inspection; pipeline corrosion, coating inspection; valves and gas distribution stations technical condition inspection; civil engineering inspection works; environmental baseline, audit and analysis.These studies will be carried out on 74% (a total of 222km) of the pipeline length covering the following sections:Section A – Kazbegi-PasanauriSection B – Pasanauri-SaguramoSection C - Saguramo-NorioSection D – Norio-Tsiteli Khidi