მოძებნე პროექტი

    ძებნის პარამეტრები

    • საძიებო სიტყვა
    • წელი
    • კლიენტი
    ოთხშაბათი, 01 ნოემბერი 2017 17:38

    Geotechnical investigation and civil design for installation of STP at Supsa Terminal

    Topographical and geotechnical surveys were performed. Reinforced concrete foundations for STP units (RBC Unit, Twin Effluent Pump Station, UV Chamber and Mag Flow meter), concrete surroundings and pipelines from STP facilities to r. Supsa were designed in accordance with provided dimensions. Layout schemes for STP facilities were determined.

    Additional Info

    • Client Name BP/BTC Co
    • Work Type Design, Survey
    • Start იანვარი 2010
    • Completion იანვარი 2010
    • Location Georgia
    Published in Projects
    გვერდი 2 სულ 2
    © 2002-2020 IDC Ltd. All Rights Reserved. Developed By GT-studio

    ძებნა